My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: pressure sewer system
Orono
>
Property Files
>
Street Address
>
W
>
Wakefield Road
>
220 Wakefield Road - 36-118-23-31-0010
>
Correspondence
>
Re: pressure sewer system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:02:19 PM
Creation date
7/8/2019 1:51:50 PM
Metadata
Fields
Template:
x Address Old
House Number
220
Street Name
Wakefield
Street Type
Road
Address
220 Wakefield Road
Document Type
Correspondence
PIN
3611823310010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A�c <br /> % °� <br /> CITYof ORONO <br /> Municipal Offices <br /> Street Address: Mailing Address: <br /> 2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323.0066 <br /> October 21, 2003 <br /> Dear Neighborhood Residents; <br /> A pressure sewer system is currently being installed in your neighborhood. This sewer system is <br /> available for hookup by neighborhood residents on a voluntary basis at this time. You can continue <br /> to use your existing septic system until the system fails or is required to be replaced because of it's <br /> nonconforming status. The present deadline for the replacement of non conforming septic systems <br /> is 2010. A conforming septic system can continue to be used until it either fails or is rendered <br /> nonconforming by future septic regulations. <br /> The sewer connection fee is currently $6,500 and will be adjusted for inflation on an annual basis. <br /> This connection fee can either be paid before connection to the sewer system or be assessed over a <br /> 15-year time period at a 6.25% annual interest rate. A signed assessment waiver will be required if <br /> you request to be assessed for the connection fee. <br /> In addition to the connection fee,there is a one time SAC fee of$1,275.This SAC fee increases on <br /> an annual basis and is payment for the additional costs of the future downstream capacity in the <br /> Metropolitan Council Sewer System. <br /> This pressure sewer system requires that each property owner install and maintain their own <br /> individual grinder pump station. A"progressive cavity"grinder pump will be required,and the City <br /> needs to approve the pump that will be installed to ensure compatibility with the sewer system. The <br /> estimated property owner costs for the grinder pump station, service connection, and septic tank <br /> abandonment can range from$7,000 to $12,000 depending on the length of the service connection <br /> required. The City's current flat rate user charge for residential sewer is approximately$90.00 per <br /> quarter. <br /> Page 1 <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> www.ci.orono.mmus <br />
The URL can be used to link to this page
Your browser does not support the video tag.