Laserfiche WebLink
�O <br /> O O <br /> CITY of ORONO <br /> i <br /> Municipal Offices <br /> Street Address: Mailing Address: <br /> `�kE+gg04' 2150 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323.0466 <br /> April 28, 2000 <br /> Timothy&Anna Otten 1 <br /> 425 Turnham Road <br /> Maple Plain, Mn 55359 <br /> Dear Mr. &Mrs. Otten: <br /> An inspection of your septic system was conducted on April 24, 2000. A summary of the inspection <br /> is below. <br /> Septic Tank Condition <br /> 1. Pumpout needed within one year.(Last Pumpout unknown.) <br /> The septic system is non-compliant due to a lack of a three foot separation distance between the bottom <br /> of the drainfield to the seasonally high watertable. The three foot requirement is a State Code,not a City <br /> Code. A soil boring was conducted to determine the depth of the seasonally watertable. The septic <br /> system must be replaced no later than December 31,2006. <br /> Enclosed is a list of state licensed septic contractors who work in Orono on a regular basis. Also <br /> enclosed is a fact sheet explaining how a septic system functions properly. Finally, an as-built drawing <br /> is enclosed that shows the approximate location of the septic system. <br /> If you have any questions regarding this report, please contact me at the City Offices at 249-4600. <br /> :Re ectfull , <br /> s Pence <br /> On-Site Systems Manager <br /> Enclosures <br /> In the event this inspection report is used to satisfy the requirements for a mortgage or other transfer of property,be <br /> advised that this report does no guarantee or certify the existing system will continue to function properly,but is <br /> merely an opinion of the adequacy of the system under current conditions based on the available information. <br /> This report must be kept on the premises with the system location and pumping records. <br /> Telephone 612 2494600 • Fax 612 2494616 <br />