My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-P06725 - new septic
Orono
>
Property Files
>
Street Address
>
T
>
Turnham Road
>
425 Turnham Road - 31-118-23-24-0003
>
Septic
>
2003-P06725 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:30:10 PM
Creation date
7/3/2019 12:56:11 PM
Metadata
Fields
Template:
x Address Old
House Number
425
Street Name
Turnham
Street Type
Road
Address
425 Turnham Road
Document Type
Septic
PIN
3111823240003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRESSURE DISTRIBUTION SYSTEM Geotextile fabric <br /> 1. Select number of perforated laterals 3 Quarter inch perforations spaced 0 3' 12 <br /> .9 of.rock <br /> 2. Select perforation spacing= 3 ft <br /> Perf Sizing 3/16"-1/4" <br /> 3. Since perforations should not be placed closer than 1 foot to Perf Spacng 1.5'-s' <br /> the edge of the rock layer(see diagram),subtract 2 feet from <br /> the rock layer length. E-4: Maximum allowable rwmber of 114-inch perbrahons <br /> per Word to guamntee<10%discharge vaddion <br /> D layer -2 ft = �ft perfordon <br /> 4. Determine the number of spaces between perforations. <br /> Divide the length(3)by perforation spacing(2)and round :t 1 Inch 1.25 Inch 1.5 inch 2.0 inch <br /> dQ=to nearest whole number. 2.5 8 14 18 28 <br /> Perforation spacing= ft+ w ft= 1.3 spaces 3.0 8 13 17 26 <br /> 5. Number of perforations is equal to one plus the number of 3.3 7 12 16 25 <br /> perforation spaces(4). Check figure E-4 to assure the number of 4.0 7 11 15 23 <br /> perforations per lateral guarantees <10%discharge variation. 15.0 6 10 14 22 <br /> ) spaces+1 = perforations/lateral E-6: Perforation Discharge In gpm <br /> 6. A. Total number of perforations= perforations per lateral (5) perforation diameter <br /> times number of laterals (1) head inches <br /> perfs/lat x 3 at= L- Z _perforations (feet) 3/16 7/32 114 <br /> 1.00 0.42 0.56 0.74 <br /> B. Calculate the square footage per perforation. 2.0b 0.59 0.80 1.04 <br /> Should be 6-10 sgft/perf.Does not apply to at grades. <br /> Rock bed area= rock width(ft)x rock length(ft) 5.0 0.94 1.26 1.65 <br /> /0 ft x �ft= 1'V sgft ousel.o root r«s�r,g�e-ron,�N non,es. <br /> Square foot per perforation=Rock bed area+number of perfs (6) b use 2.0 feet for an in else. <br /> 10 sgft+____LJ7Z..perfs gft/perf MA,IFOL, LOCATED AT ENO OF PREMAE DISTRIBUTION SYSTEM <br /> 7. Determine required flow rate by multiplying the total number of <br /> perforations (6A) by flow per perforation(see figure E-6) <br /> 11�-► �r4. Wt RSO.. <br /> F�Z perfs x 7 -I gpm/perfs= 3 I gpm <br /> 8. If laterals are connected to header pipe as shown on upper10 <br /> , <br /> example,to select minimum required lateral diameter;enter "° <br /> figure E-4 with perforation spacing(2)and number of perforations <br /> per lateral(5) Select minimum diameter for <br /> 4TOUT OF FEIIF°MTEp FN[UTERINE FOR <br /> perforated lateral= 11)-t. inches. "' "`° <br /> RN+M:r!L <br /> 9. If perforated lateral system is attached to manifold pipe near <br /> the center,lower diagram,perforated lateral length(3) and <br /> number of perforations per lateral (5)will be approximately one <br /> half of that in step 8. Using these values,select minimum <br /> diameter for perforated lateral= inches. <br /> OMC <br /> Of <br /> nRvi <br /> I hereby certify that I have completed this work in accordance with applicable ordinances, rules and laws. <br /> (signature) 2` (license#) - )'d 3 (date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.