My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-P06725 - new septic
Orono
>
Property Files
>
Street Address
>
T
>
Turnham Road
>
425 Turnham Road - 31-118-23-24-0003
>
Septic
>
2003-P06725 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:30:10 PM
Creation date
7/3/2019 12:56:11 PM
Metadata
Fields
Template:
x Address Old
House Number
425
Street Name
Turnham
Street Type
Road
Address
425 Turnham Road
Document Type
Septic
PIN
3111823240003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.' MOUND DESIGN WORK SHEET(For Flows up to 1200 d) <br /> A. Average Design FLOW A-1: Estimated Sewage Flows in Gallons per Day <br /> number o <br /> Estimated 4 S0 gpd (see figure A-1) bedrooms Class I clan II class III Class Iv <br /> or measured x 1.5 (safety factor) = gpd 2 300 225 180 60% <br /> 3 450 300 218 of the <br /> 4 600 375 256 values <br /> B. SEPTIC TANK Capacity 5 750 450 294 In the <br /> 6 900 525 332 Class I, <br /> oZ —/00 0allons (see $ure C-1) 7 1050 600 370 II,or III <br /> $ 8 1 1200 1 675 1 408 1 columns. <br /> C. SOILS (refer to site evaluation) Gl: Septic A capacities auons <br /> Number of Minimum li9 uid d l with U uid capacity <br /> 1. Depth to restricting layer= a•0 ¢ a•3 feet <br /> Bedrooms Capacity B�age&po wit disc& <br /> 2. Depth of percolation tests = 40 feet 2aless 750 1125 1500 <br /> 3. Texture 61-�A`A L-0�4wN 3 as wo 2WS a 6 115M 500 2250 3000 <br /> Percolation rate -4.4 mpi 7,8 or 9 2000 30°0 <br /> 4. Soil loading rate t 4.,' gpd/sqft(see figure D-33) <br /> 5. Percent land slope 3 % <br /> D. ROCK LAYER DIMENSIONS <br /> 1. Multiply average design flow (A) by 0.83 to obtain required rock layer area. <br /> gpd x 0.83 sqft/gpd = 3 7 3 sgft+o'5,;=410'6 <br /> 2. Determine rock layer width= 0.83 sqft/gpd x linear Loading Rate (LLR) <br /> 0.83 sqft/gpd x 1-2_ gpd/sgft= 10 ft Mound LLR <br /> 3. Length of rock layer = area+width= <br /> H 10 sqft(D1) + /0 ft (D2) =4_ft < 120 MPI <12 <br /> E. ROCK VOLUME > 120 MPI < 6 . <br /> 1. Multiply rock area (Dl)by rock depth of 1 ft to get cubic feet of rock <br /> L4) o sgft x 1 ft = LhQ cult <br /> 2. Divide cuft by 27 cuft/cuyd to get cubic yards <br /> 4) 0 cuft +27 cuyd/cuft=1S-cuyd <br /> 3. Multiply cubic yards by 1.4 to get weight of rock in tons <br /> 1 S cuyd x 1.4 ton/cuyd =a)_tons <br /> 'D-33: Absorption Width Sizing Table <br /> Percolation Rate Loading Rate <br /> F. SEWAGE ABSORPTION WIDTH in Minutes per Soil Texture Gallana Absorption <br /> Inch per day per Ratio <br /> MPI foot <br /> Faster than 3 Coarse Sand 1.20 1.00 <br /> Medium Sand <br /> Absorption width equals absorption ratio (See Figure D-33) Loamy ;:d n79 I <br /> times rock layer width (D2) t o, o0 <br /> l teaSi t .a0 <br /> 2,v? x�ft =�ft Sill <br /> 46to60 Silt Q0 Loam 0.45 2.67 <br /> 61 to 120 Siltq Clay 0.24 .00 <br /> Sandy pay <br /> i Clay <br /> Slower than 120*1 <br /> •Symm designed for awe soils mm be other or perfomence <br />
The URL can be used to link to this page
Your browser does not support the video tag.