My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-P04408 - new septic system
Orono
>
Property Files
>
Street Address
>
T
>
Turnham Road
>
385 Turnham Road - 31-118-23-31-0006
>
Septic
>
2001-P04408 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:30:34 PM
Creation date
7/3/2019 11:55:44 AM
Metadata
Fields
Template:
x Address Old
House Number
385
Street Name
Turnham
Street Type
Road
Address
385 Turnham Road
Document Type
Septic
PIN
3111823310006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUMP SELEMON-PROCEDURE <br /> 1. Determine pump capacity: <br /> A. Gravity distribution <br /> 1. Minimum required discharge is 10 gpm <br /> 2. Maximum suggested'discharge is 45 gp n. For other <br /> establishments at.least 10%greatei:than the water supply rate, <br /> but no faster than the rate at which effluent will flow out of the <br /> distribution device. <br /> B. Pressure distribution <br /> See pressure-distribution work sheet <br /> From*A or B Selected-pump capacity: 4o gpm <br /> 2. Determine pump*head requirements: . . <br /> A. Elevation difference between pump and point of discharge? soil treatment system <br /> feet &p Int of di charge <br /> B. Special head requirement?(See Figure at right-Special Head Requirements) total Ipe <br /> feet lengt <br /> Inlet 2A.elevation <br /> C. Calculate Friction loss pipe difference <br /> 1. Select pipe diameter a 0 in <br /> 2. Enter Figure E-9 with gpm 1A or B) ' <br /> 8� ( and pipe diameter(C1). <br /> Read friction loss in feet per 100 feet from Figure E-9 Special Head Requirement s <br /> Friction Loss ft/100ftof pipe Gravity Distribution 0 ft <br /> 3. Determine total pipe length frompump discharge to soil treatment Pressure Distribution 5 ft <br /> discharge point.Estimate by adding 25 percent to pipe length for <br /> fitting loss.Total pipe length times 1.25=equivalent pipe length <br /> 8 5 feet x 1.25 = Jb (o feet E-9; Friction Loss in Plastic Pipe <br /> 4. Calculate total friction loss by multiplying friction loss (0) Per 100 feet <br /> nominal <br /> in f /100 f .by the equivalent pipe-leng-length(C ) and divideby 100. 1. ipe diameter ter <br /> ft/100ftx /n� . +100= 3 ft flow rate <br /> 2" 3" <br /> IDIOM <br /> D. Total head required is.the sum of elevation difference(A),special 20 2.47 0.73 0.11 <br /> head requirements.(B),and total friction loss (C4) 25 3.73 1.11 0.16 <br /> �c ft+ S ft+ 3 . ft= 30 5.23 1.55 0.23 <br /> Total head: ► L+ 'feet 35 6.96 2.06 0.30 <br /> 40 8.91 2.64 0.39 <br /> I Pump selection 45 11.07 3.28 0.48 <br /> 50 13.46 3.99 0.58 <br /> A pump must be selected to deliver at least . 4 0 55 4.76 0.70 Qpm � .60 0.82 <br /> 60 5 <br /> (1A or B) with at least J_� _feet of total head (2D) 65 5.48 0.95 <br /> 70 7.44 1.09 <br /> I hereby certify that I have completed this work in accordance with applicable ordinances, .rules and laws. <br /> i �` 4---(signature) 3-� ,�(license#) 7 - 1-b ) (date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.