My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-P06060 - gas line inspection
Orono
>
Property Files
>
Street Address
>
T
>
Turnham Road
>
380 Turnham Road - 31-118-23-42-0008
>
Permits/Inspections
>
2003-P06060 - gas line inspection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:32:11 PM
Creation date
7/3/2019 11:31:31 AM
Metadata
Fields
Template:
x Address Old
House Number
380
Street Name
Turnham
Street Type
Road
Address
380 Turnham Road
Document Type
Permits/Inspections
PIN
3111823420008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3b2 - 711 <br /> 1-7. '7(o <br /> CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT <br /> Box 66 (2 750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> GENERAL INFORMATION <br /> 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be <br /> reviewed and a permit will be issued within two working days. <br /> 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID <br /> UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS <br /> POSTED ON THE JOB SITE. <br /> 3. Mechanical Designs Complete calculations, details and specifications are required for each heating, <br /> ventilation,humidification-dehumidification, and air conditioning installation including heat loss/heat <br /> gain calculation, design temperatures, equipment ratings and identification as to type, manufacturer and <br /> model. Data shall be presented on form provided. Identification of and specifications for water heating <br /> equipment shall also be provided. <br /> 4. When any new construction or remodeling is involved, a separate building permit must be obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code <br /> requirements. <br /> 6. All work must be inspected(rough-in and final). Call(952)249-4600. 24-hour notice required. <br /> 7. House Heating Test Record must be submitted before final. <br /> Instructions . <br /> Complete all items on this application. Compute the permit fee. Sign and date the certification. <br /> INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call <br /> (952) 249-4600. <br /> Please check one: ❑ New ❑ Addition URepair ❑ Replace ❑ Residential ❑ Commercial <br /> i <br /> JOB SITE: �� U� Qm �c� . n j� ��i r1 Zip: � 3 _ <br /> 5 <br /> Owner's Name: z Phone Number: AS 2 - 47 5`3 q!j 21 <br /> - <br /> Mailing Address: 3 Sf 'r urn --� <br /> g h�--� �'�. City:�Jc �/Gtr� Zip: <br /> Contractor's Name: Tia red, if Phone Number: -7,O 3 Sq 2 -I 16 6 <br /> Mailing Address: oq City: l& Zip: S-c/0 7 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.