My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-006143 - replace septic system
Orono
>
Property Files
>
Street Address
>
T
>
Turnham Road
>
380 Turnham Road - 31-118-23-42-0008
>
Septic
>
1994-006143 - replace septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:32:11 PM
Creation date
7/3/2019 11:27:31 AM
Metadata
Fields
Template:
x Address Old
House Number
380
Street Name
Turnham
Street Type
Road
Address
380 Turnham Road
Document Type
Septic
PIN
3111823420008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENO PERFORATION OF A KRFOWTEO L <br /> PRESSURE DISTRIBUTION SYSTEM <br /> am"CSVW <br /> 1. Select number of perforated laterals K *•M•y MAMW�y <br /> ' Y`.•Lorca w tiaewlee Fawn tar lav <br /> • Loamy Sets torts :rrw lgar w May ar ire.C~d <br /> 2. Select perforation spacing= feet. �^,+.►t <br /> rararellae Onllae Hwuaerally <br /> • eua Cao Nae, Ae <br /> 3. Since perforations should not be placed closer than I ft. to �•' "s l " ft= o 1.cee. <br /> e n .km,. .f Me.L.Pw <br /> the edge of the rock layer(see diagram),subtract 2 ft. from :.►t..al.,,.t,.aw at <br /> the rock layer length. <br /> ;'. Clem Sew Loner laeanr d waw <br /> � orlefeel s.0 H.ear swmw <br /> �la��ph-2ft. = 3 feet. �• �Layer <br /> TABLE OF PERFORATION DISCHARGES IN cPtit <br /> 4. Determine the number of spaces between perforations. Had Perforation diameter(inches) <br /> Divide the length above by perfc:;:.'---:pacing and round <br /> down to nearest whole number. <br /> l <br /> 1.0a > a-% <br /> 0.69 0.90 <br /> Length perf. spacing --�3 ft.+ ft. _ 7 spaces ss JO <br /> o 1.04 <br /> (3) (2) 3.0 0.98 I.M <br /> 5. Number of perforations is equal to one plus the number of a 1.13 1.47 <br /> perforation spaces . <br /> 5.0 1.26 I 1.63 <br /> IUse 1.0 foot of head for residential systems <br /> bU <br /> 4 spaces + i perforations/lateral ._ <br /> se i0 feet of head for other establishes r <br /> = <br /> AIrY.e��1..IrI�So ." rirV.I Y <br /> 6. Multiply perforations per lateral by number of laterals to �,.,,,.,� <br /> get total number of perforations. Zs 1 la ch 1 1i h 2.0zs <br /> .z=:� 13 26 <br /> X = SY perforations. 4.0 11 is 233 <br /> 3.0 10 14 22 <br /> 7. Determine required flow rate by multiplying <br /> number of perforations by flow per perforation <br /> 0,7y, <br /> /V jn. rrwo6o Lnurm v w <br /> ar oo saiwi estw.u� s�srrr <br /> — <br /> PX atn/P•rf <br /> 8. If laterals are connected to header pipe as shown on upper <br /> example, to select minimum required lateral diameter,enter <br /> table with perforation spacing and number of perforations <br /> per lateral. Select minimum diameter for \� <br /> perforated lateral = inches. .,,. <br /> 9. If rerforated lateral system is attached to manifold pipe near '�`•'"''' <br /> the center,lower diagram,perforated lateral length Pand <br /> number of perforations per lateral will be approximately one �'' •r4 <br /> half of that in step 8. Using these values, select minimum "" �,,,,.•�\ <br /> diameter for perforated lateral inches. �,,.'' <br />
The URL can be used to link to this page
Your browser does not support the video tag.