My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-00698 - new septic
Orono
>
Property Files
>
Street Address
>
T
>
Turnham Road
>
340 Turnham Road - 31-118-23-42-0007
>
Septic
>
2012-00698 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:32:10 PM
Creation date
7/3/2019 10:54:58 AM
Metadata
Fields
Template:
x Address Old
House Number
340
Street Name
Turnham
Street Type
Road
Address
340 Turnham Road
Document Type
Septic
PIN
3111823420007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ORONO — SEPTIC SYSTEM PERMIT APPLICATION <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> offices; however, permits will not be mailed out. The permit must be picked up in person at <br /> the City offices and work must not begin unless the permit card is on the job site. <br /> *** DO NOT MAIL PAYMENT WITH THIS APPLICATION *** <br /> 2. Permits will be only issued to contractors holding a Minnesota Pollution Control Agency <br /> (MPCA) Septic System Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Tank installation prior to covering. <br /> B. Drainfield trench installation prior to covering. For mounds, inspection is required after <br /> rough up, but prior to sand placement (sand must be jar tested for silt content) and <br /> again during pressure distribution piping installation in the rock bed. <br /> C. Final inspection to verify final cover depths and to verify that all pump station (where <br /> required) components are functional and comply with codes. <br /> 5. MPCA licensed Installers or their DRP (Designated Responsible Person) shall be present <br /> during all inspections. <br /> A 24-HOUR NOTICE IS REQUIRED FOR ALL INSPECTIONS. <br /> W:\(Permits)\Septic Permit Application-Updated Surcharge 07-28-11.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.