Laserfiche WebLink
.� 0,11 ' <br /> 0 O <br /> t � CITY of ORONO <br /> Municipal Offices <br /> Street Address: Mailing Address: <br /> '9J� Hp4' 2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323.0066 <br /> April 28, 2000 <br /> Ronald& Jennifer Zelinsky <br /> 320 Turnham Road <br /> Maple Plain, Mn 55359 <br /> Dear Mr. &Mrs. Zelinsky: <br /> An inspection of your septic system was conducted on April 24, 2000. A summary of the inspection <br /> is below. <br /> Septic Tank Condition <br /> 1. Pumpout needed within one year(Last pumpout 4/16/97). <br /> The septic system is a compliant system, meaning it meets all current City and State Standards. <br /> Enclosed is a list of licensed contractors who work in Orono on a regular basis. This list is enclosed <br /> simply for your reference in case your septic system needs maintenance in the future. Also enclosed <br /> is a fact sheet explaining your septic system and how it functions. Finally, an as-built drawing is <br /> enclosed showing the approximate location of the septic system. <br /> If you have any questions regarding this report, please contact me at the City Offices at 249-4600. <br /> Re ectfup1l , <br /> s Pence <br /> On-Site Systems Manager <br /> I <br /> Enclosures <br /> In the event this inspection report is used to satisfy the requirements for a mortgage or other transfer of property, <br /> be advised that this report does no guarantee or certify the existing system will continue to function properly,but <br /> is merely an opinion of the adequacy of the system under current conditions based on the available information. <br /> This report must be kept on the premises with the system location and pumping records. <br /> Telephone(612)2494600 • Fax(612)2494616 <br />