My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-06-2019 Park Commission Minutes
Orono
>
Park Commission
>
Minutes
>
2010-2019
>
2019
>
05-06-2019 Park Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 3:24:45 PM
Creation date
7/2/2019 3:24:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br /> ORONO PARK COMMISSION <br /> Monday,May 6,2019 <br /> 6:30 o'clock p.m. <br /> STAFF REPORTS <br /> 2. PUBLIC WORKS PARKS UPDATE <br /> Edwards reported on the following activities of the Public Works Department: <br /> • Port-a-Pots and garbage cans have been placed at all parks. <br /> • Spring inspections have begun of all parks and are nearly completed. <br /> • One additional round of snow and ice removal was done on the trails. No major trail projects are <br /> planned for this year. <br /> • The golf course is now open for the season. Since opening, some irrigation repairs have been <br /> done, a new water softener was installed, and some flushing of the drain system was performed. <br /> • The City Council did award the drainage cart path project for the golf course. <br /> • A baby swing was installed at Antoine Park. <br /> • Big Island Park was inspected. Some dock repairs need to be performed and a dock modification <br /> to get the docks in and out easier. <br /> • Biweekly maintenance work will be commencing next week at the parks. <br /> • Gravel for the parking lot at French Creek was installed. <br /> • Tree removal was performed at Saga Hill. <br /> • The ice rink was removed at Crystal Bay and removal of the existing split rail fence is scheduled <br /> due to its deteriorating condition. <br /> • Closed the winter access points and opened the summer access points around Orono. Performed <br /> dock repairs at the Loma Linda access due to damage caused from a snowmobiler. An insurance <br /> claim has been submitted. <br /> • The sunshades were installed at Lurton Park and some fence repairs are scheduled. Prairie <br /> Restoration performed its 5-year burn of the prairie. Last year they performed a close mow, <br /> which does not work as well as the burn,but does not cause a lot of soot. <br /> • Tree removal was performed at French Creek. <br /> Edwards indicated he did meet with the Girl Scout who is interested in completing the memorial garden <br /> project at Lurton Park. Work on that project is expected to start in the near future. A meeting was also <br /> held with the Boy Scout who will be constructing a screen around the port-a-pot and some trail work. <br /> Johnson asked when the projects are anticipated to be complete. <br /> Edwards stated he expects the Girl Scout project to be completed by early summer and that he is not sure <br /> when the Boy Scout will be commencing his work. <br /> The surveying for the Bederwood sports field project has been completed and a design is underway. The <br /> draft design is expected to be completed in the next week and a half. <br /> The grant applications for the Big Island project and East Long Lake Road will be submitted to the DNR <br /> and grant awards are expected by the end of June/early July. <br /> The City Council approved the cooperative agreement for the Dakota Trail connection. Three Rivers <br /> Park District is the lead designer on that and they hope to have 60 percent of the design to all the partners <br /> by the end of July. Each of the three partners(Hennepin County,the City of Orono, and Three Rivers) <br /> Page 2 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.