My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-00589 - new structure
Orono
>
Property Files
>
Street Address
>
T
>
Turnham Road
>
125 Turnham Road - 31-118-23-43-0018
>
Permits/Inspections
>
2012-00589 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:32:58 PM
Creation date
7/1/2019 2:09:39 PM
Metadata
Fields
Template:
x Address Old
House Number
125
Street Name
Turnham
Street Type
Road
Address
125 Turnham Road
Document Type
Permits/Inspections
PIN
3111823430018
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor shall ensure all surrounding structures are protected from the effects of wall <br /> excavation. Excavation support, if required, is the responsibility of the Contractor. <br /> 4.03 Foundation Preparation <br /> A. Following the excavation, the foundation soil shall be examined by the Owner's Engineer <br /> to assure actual foundation soil strength meets or exceeds the assumed design bearing <br /> strength. Soils not meeting the required strength shall be removed and replaced with infill <br /> soils, as directed by the Owner's Geotechnical Engineer. <br /> B. Foundation soil shall be proof-rolled and compacted to 95%standard Proctor density and <br /> inspected by the Owner's Geotechnical Engineer prior to placement of leveling pad <br /> materials. <br /> 4.04 Leveling Pad Construction <br /> A. Leveling pad shall be placed as shown on the final,P.E.-sealed retaining wall plans with a <br /> minimum thickness of 6 inches. The leveling pad should extend laterally at least a <br /> distance of 6 inches from the toe and heel of the lowermost SRW unit. <br /> B. Granular leveling pad material shall be compacted to provide a firm, level bearing surface <br /> on which to place the first course of units. Well-graded sand can be used to smooth the <br /> top 1/4 inch to 1/2 inch of the leveling pad. Compaction will be with mechanical plate <br /> compactors to achieve 95%of maximum standard Proctor density (ASTM D 698). <br /> 4.05 SRW Unit Installation <br /> A. All SRW units shall be installed at the proper elevation and orientation as shown on the <br /> final,P.E.-sealed wall plans and details or as directed by the Wall Design Engineer. The <br /> SRW units shall be installed in general accordance with the manufacturer's <br /> recommendations. The specifications and drawings shall govern in any conflict between <br /> the two requirements. <br /> B. First course of SRW units shall be placed on the leveling pad. The units shall be leveled <br /> side-to-side, front-to-rear and with adjacent units, and aligned to ensure intimate contact <br /> with the leveling pad. The first course is the most important to ensure accurate and <br /> acceptable results. No gaps shall be left between the front of adjacent units.Alignment <br /> may be done by means of a string line or offset from base line to the back of the units. <br /> C. All excess debris shall be cleaned from top of units and the next course of units installed <br /> on top of the units below. <br /> D. Two VERSA-Tuff connection pins shall be inserted through the pin holes of each upper- <br /> course unit into receiving slots in lower-course units.Pins shall be fully seated in the pin <br /> slot below. Units shall be pushed forward to remove any looseness in the unit-to-unit <br /> connection. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.