Laserfiche WebLink
Buildin Analysis Job: <br /> g l Date: Dec 27th,2011 <br /> Entire House By: Jason Massmann <br /> -Proiect Information <br /> For: Masterpiece Homes <br /> 127 County Road C, Little Canada, MN <br /> Phone: 651-484-3244 <br /> - • Conditionsi <br /> Location: Indoor: Heating Cooling <br /> Minneapolis/St. Paul, MN, US Indoor temperature(°F) 72 75 <br /> Elevation: 837 ft Design TD (°F) 93 22 <br /> Latitude: 45°N Relative humidity(%) 30 45 <br /> Outdoor: Heating Cooling Moisture difference(gr/Ib) 34.6 57.1 <br /> Dry bulb (°F) -21 97 Infiltration: <br /> Daily range (°F) - 19 ( M ) Method Simplified <br /> Wet bulb (°F) - 78 Construction quality Tight <br /> Wind speed (mph) 15.0 7.5 Fireplaces 0 <br /> • <br /> Component Btuh/ft' Btuh % of load /�°-� <br /> Walls 5.7 31590 46.5 / <br /> Glazing 40.4 16414 24.1 <br /> Doors 17.3 5262 7.7 �.. <br /> Ceilings 1.8 3891 5.7 <br /> Floors 0.4 1067 1.6 <br /> Infiltration 1.2 5653 8.3 <br /> Ducts 0 0 <br /> Piping 4093 6.0 <br /> Humidification 0 0 <br /> Ventilation 0 0 <br /> Adjustments 0 <br /> Total 67970 100.0 <br /> Component Btuh/ft2 Btuh % of load <br /> Walls 1.2 6626 25.4 <br /> Glazing 33.9 13778 52.8 <br /> Doors 6.3 1911 7.3 <br /> Ceilings 1.1 2399 9.2 ° <br /> Floors 0.3 720 2.8 <br /> Infiltration 0.1 655 2.5 <br /> Ducts 0 0 <br /> Ventilation 0 0 <br /> Internal gains 0 0 <br /> Blower 0 0 <br /> Adjustments 0 <br /> Total 26088 100.0 -- <br /> Latent Cooling Load = 1076 Btuh <br /> Overall U-value= 0.078 Btuh/ft2-°F <br /> Data entries checked. <br /> V1/I 1 flt SOfY 2012-Sep-25 07:02:24 <br /> 9 Right-Suite®Universal 8.0.18 RS000282 Page 1 <br /> ...mal\My Documents\Wrightsoft HVAC\Master Piece Homes Rochel.rup Calc=MJ8 Front Door faces: <br />