My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-00837 - new septic
Orono
>
Property Files
>
Street Address
>
T
>
Turnham Road
>
125 Turnham Road - 31-118-23-43-0018
>
Septic
>
2012-00837 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:32:59 PM
Creation date
7/1/2019 1:58:55 PM
Metadata
Fields
Template:
x Address Old
House Number
125
Street Name
Turnham
Street Type
Road
Address
125 Turnham Road
Document Type
Septic
PIN
3111823430018
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Pressure Distribution <br /> UNIVERSITY A'�"`-` <br /> Minnesota Pollution <br /> J <br /> Control Agency Design Worksheet OF MINNESOTA <br /> Project ID: v 11.09.22 <br /> 1. Select Number of Perforated Laterals in systernIzone: <br /> (2 feet is minimum and 3 feet is maximum spacing) <br /> 2. Select Perforation Spacing: 3 0 ft <br /> Min mum <br /> '/,'P-1.,.fin.spaced 3'apart <br /> 3. Select Perforation Diameter Size in i - <br /> 6-wf rock <br /> 4. Length of Laterals =Media Bed Length-2 Feet. perforati.. W.0!-/."to•I.- Pedorwtlon spat:hvq:2'to 3' <br /> 63 - 2ft = 61 ft Perforation can not be closer then 1 foot from edge. <br /> 5. Determine the Number of Perforation Spaces. Divide the Length of Laterals (Line 4)by the Perforation Spacing (Line 2)and <br /> round down to the nearest whole number. <br /> Number of Perforation Spaces = 61 ft + 3 ft = 20 Spaces <br /> 6. Number of Perforations per Lateral is equal to 1.0 plus the Number of Perforation Spaces (Line 5). <br /> Perforations Per Lateral = 20 Spaces + I = 21 Perfs. Per Lateral <br /> Check table below to verify the number of perforations per lateral guarantees less than a 10%discharge variation. The value is <br /> double If the a center manifold Is used. <br /> ftwinm Rtm*w of Perforatiom Per-Waal to Gwar tee 00%Discharge Variation <br /> t.Inch Perforations 7132 Inch Perforations <br /> Perforation Spacing(Feet) Pipe Diameter(Inches) Perforation Spacing Pipe Diaineter(Incl*s) <br /> i 116 lit 2 3 (Feet) I 116 ilt 2 3 <br /> 2 10 13 18 30 60 2 ti 16 21 34 69 <br /> N 8 12 16 28 54 2Y 10 14 20 32 64 <br /> 3 8 12 16 .25 52 3 9 14 19 30 60 <br /> 3116 Inch Perforations 1/8 Inch Perforations <br /> Perforation Spacing(FW,) Pipe Diameter(Inches) Perforation Sparing Pipe Diameter(Inches) <br /> I IJA Ot 2 3 (Feet) 1 114 % 2 3 <br /> 2 12 19 26 46 87 2 21 33 44 74 149 <br /> n 12 U 24 40 go 2% 20 30 41 69 135 <br /> - 3 12 16 1 22 1 37 75 -T- 3 20 29 1 38 64 128d <br /> 7. Total Number of Perforations equals the Number of Perforations per Lateral (Line 6)multiplied by the Number of <br /> Perforated Laterals (Line 1). <br /> 21 Perf. Per Lateral X Number of Perf. Laterals Me 63 Total Number of Perf. <br /> 8. Calculate the Square Feet Per Perforation. Recommended value Is 4-10ft2 per perforation. Perteration DUcharge(GPM) <br /> Does not apply to At-Grades Head 00 Fork""M Dierneter <br /> Bed Area = Bed Width(ft)X Bed Length(ft) <br /> 1.91 0.18 0.41 0.56 <br /> IS 0.22 0.31 0.69 0.9 <br /> 10 ft X 63 ft 630 fe 2.61 0.26 0.59 .040 1.04 <br /> 2.5 a." 0.65 0.89 _1.17 <br /> 2.0 0.32 0.72 09 <br /> Square Foot per Perforation =Bed Area divided by the Total Number of Perforations (Line 7). 4.0 0.27 0.83 t.138 1.47 1.28 <br /> SO 0.41 1 0.93 4.26 1.65 <br /> 630 I foot Dwelling Mth 3/16irwh to 114 imh <br /> ft2 + perforations fe/peTforations ped-tioes <br /> DweIfinp with I la inch perforittim <br /> 2 feet Other emsbUshnients midAsTS with.3/16 <br /> 9. Select Minimum Average Head: ft Inch to 14 inch perforatbm <br /> 5,.,.t Other atelAishments 80d AISTS vd,11 I IS inch <br /> 10. Select Perforation Discharge (GPM)based on Table III: 0.56 GPM per Perforation Perforations <br /> 11. Determine required Flow Rate by multiplying the Total Number of Perforations (Line 7)by the Perforation Discharge (Line 10). <br />
The URL can be used to link to this page
Your browser does not support the video tag.