Laserfiche WebLink
• = BO I_TON 8 . M r-=N K , <br /> OR COPY <br /> Consulting Engineers & Surveyors <br /> 2638 Shadow Lane,Suite 200•Chaska, MN 55318-1172 <br /> Phone(952)448-8838•Fax(952)448-8805 <br /> www.bolton-menk.com <br /> July 17, 2012 <br /> City of Orono <br /> Attn: Melanie Curtis <br /> PO Box 66 <br /> Orono,Mn 55323 <br /> RE: Building Permit Application 2012-00589 <br /> House Construction <br /> 125 Turnham Road <br /> Dear Melanie: <br /> As requested, we have completed an engineering review of the Site Design Plan prepared by Anthony <br /> Rochel dated January 31, 2012 submitted for the above referenced project. We offer the following <br /> observations,comments, and recommendations for your consideration. <br /> Review Comments <br /> 1. The information on the Site Design Plan should be added to the Certificate of Survey to create <br /> one complete document per City requirements. <br /> 2. The Storm Water Pollution Prevention Plan (SWPPP)measures shown on the Site Design plan <br /> are acceptable, and the placement of perimeter silt fence according to the SWPPP was verified on <br /> July 12, 2012. <br /> 3. Minnehaha Creek Watershed District(MCWD)has approved the currently submitted Wetland <br /> Buffer Establishment Plan. Therefore,we agree the placement of 6"topsoil in the buffer area and <br /> location of Wetland Buffer Markers are acceptable. <br /> 4. The remaining comments listed on the letter prepared by Bolton&Menk dated July 16, 2012,but <br /> not addressed by this review, should be listed as conditional to the Building Permit approval. <br /> Please contact me if you have any questions or need additional information. <br /> Sincerely, <br /> BOLTON&MENK, INC. <br /> Robert E.Bean,Jr.,P.E. <br /> Water Resources Engineer <br />