My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-009348 - new septic system
Orono
>
Property Files
>
Street Address
>
T
>
Truffula Trail
>
125 Truffula Trail - 33-118-23-44-0041
>
Septic
>
1997-009348 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:53:17 PM
Creation date
7/1/2019 10:24:02 AM
Metadata
Fields
Template:
x Address Old
House Number
125
Street Name
Truffula
Street Type
Trail
Address
125 Truffula Trail
Document Type
Septic
PIN
3311823440041
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E140 PERFCRATION CF 4 PEAFORAT90 LATERAL <br /> PRESSURE DISTRIBUTT0N SYSTEM <br /> Taoew t. <br /> I. Select number of perforated laterals 3 <br /> '.•La1w of Geaaslea RsWa lar fW <br /> .• Law"Sana L"W ha er ww"Wwoa <br /> 2. Select perforation spacing = feet "'�' <br /> ��— , 110b" <br /> rera/t�TT«ll.auaaal� <br /> 3. Since perforations should not be placed closer than I ft. to ;horgin F1N.a« : am 'tom `°� <br /> the edge of the rock layer(see diagram), subtract 2 ft. from Pwloralaaa l.�at« <br /> Y g of <br /> clala sane �r e.n«w el Larval <br /> the rock layer length. / <br /> �J/� orlyaa Sell PM-06"Y Scarltted <br /> ---� 3 feet. <br /> ft. = S - .aw.PIa«�a saM <br /> Rock layer length TABLE OF PERFORATION DISCHARCES IN CM <br /> 4. Determine the number of spaces between perforations. Head Perforation diarneter(inches) <br /> Divide the length above by perforation spacing and round tea t/, <br /> down to nearest whole number. 0.56 0.73 <br /> 1.5 0.69 0.90 <br /> Length perf. spacing ft.+-: ft. = t 7 spaces is <br /> a� �:i <br /> (3) (2) 3.0 0.98 1=8 <br /> S. Number of perforations is equal to one plus thr number of 5.o 1.26 1.65 <br /> perforation spaces . <br /> aL'se 1.0 foot of head for residential systems. <br /> buss 20 feet of head for other establishments <br /> spaces + 1 =_�,perforations/lateral <br /> ..W drt <br /> 6. Multiply perforations per lateral by number of laterals to --1— 1.2.5inch 1 J inch - 2.0 inch <br /> get total number of perforations. 2s 14 28 <br /> 3. 13 `11 ' 26 <br /> _3 r$ —3 3� 12 16 25 <br /> b`� perforations. 4.0 11 15 23 <br /> laurel a x Pads/Imeral= 5.0 10 1; 22 <br /> 7. Determine required flow rate by multiplying <br /> number of perforations by flow per perforation <br /> 5-4 0',2`f = q gpm. W.a.a <br /> patsx 81Ziwf <br /> 8. If laterals are connected to header pipe as shown on upper <br /> example, to select minimum required lateral diameter; enter ✓��? <br /> l�r.�rs <br /> table with perforation spacing and number of perforations <br /> per lateral. Select minimum diameter for <br /> perforated lateral = inches. <br /> s <br /> 9. If perforated lateral system is attached to manifold pipe near =` <br /> the center, lower diagram, perforated lateral length and " Mr,="'—' <br /> number of perforations per lateral will be approximately one / �, "'' <br /> half of that in step8. Using these values, select minimum „�''� ��° , <br /> diameter for perforated lateral = 1l2 inches. �.��''�� Z <br /> �6,J <br />
The URL can be used to link to this page
Your browser does not support the video tag.