Laserfiche WebLink
501-1 <br /> �.�.;j. !'fir: E31 <br /> H.u. 0 Homebuilders Inc . Report ( cont. ) pg.-2 <br /> Size of septic tanks needed 2-1000 gallon sealed tanks <br /> 'These tanks should be pumped out every 2-3 years <br /> The present sites are ropoed off to prevent any construction from <br /> compacting the sites , this prcocedure should be continued, <br /> There is some concern that the alternate site might be distubed during <br /> construction due to the location of the house. Therefore another soil <br /> boring was done north of the primary site indicating the following results; <br /> SB-1A 0-16"Topsoil ( Black Loam ) 10 YR 2/1 <br /> 16-60 " Park Prown Clay 10 , YR 3/4 <br /> r"ottled soil was encounter at 26 inches. <br /> Therefore another mound system could be installed in this area <br /> however the perc . tests will have to be done in the spring when the <br /> frost is out of the ground to obtain accurate results. <br /> * Note the land slope in this area is 6 which conforms to the <br /> local codes and the r,'inn. Rules 7080. <br /> Site Evaluator <br /> Hobert A. Koch M.PC .A. #,E 193 <br />