My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: Hse issues
Orono
>
Property Files
>
Street Address
>
T
>
Truffula Trail
>
125 Truffula Trail - 33-118-23-44-0041
>
Correspondence
>
Re: Hse issues
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:53:18 PM
Creation date
7/1/2019 9:49:16 AM
Metadata
Fields
Template:
x Address Old
House Number
125
Street Name
Truffula
Street Type
Trail
Address
125 Truffula Trail
Document Type
Correspondence
PIN
3311823440041
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 8. 1998 <br /> Mr, 1-,N le ontan <br /> CITY OF ORONO <br /> ('via fax) <br /> Dear Mr. Oman: <br /> We have received a draft COpN'Of VOtir letter to RKC)Homcbuildcrs. Inc.via lax The following,is a list of our continued <br /> expectations and requirements that we do not-cc in your letter: <br /> *Please indicatc that the fi)undation for the front stoop is currcnt1N cracked in two Places and needs to be rcTriired at the timc of <br /> stoop replacement. Attached is an additional letter front our structural engineer regarding this_ along with cracks in the mortar <br /> that-.N ill need to be taken care of. <br /> *We believe that it is necessary to pour a footing for an additional step w'ilh stoop in order to meet 8" rise requirements, thong,with <br /> $rade requirements <br /> *The lack of seal below•the'threshold of service doors and front door 1,vas not mentioned in i.01ir Icrii r.but should also be:taken care <br /> or Ln, the builder. <br /> *As per Our K-1 8-98 letter. we maintain.that the mound system should be built according to the dcsign on record. <br /> You have included the fact that the dike nccds to be added to. We ce.ttainly agree thin filetii�nd on LItC duw'1lSlOpl'dike 17GCd5 t(1 be <br /> extended to meet absorption requirements. Iloweyet_ please note.that the designer(of design on record) has indicated that the <br /> mound height was over onc. foot too high We expect this slope.error to be corrected bti' remmal,of some of the vertical material <br /> rather than enlarging the dike t+cyond what the.original design requirements called for. It has also been noted that the designer <br /> indicates that the rock bed is f ve feet shorl. This should be corrected when the material has hcen removed from the top of the <br /> mound system. <br /> Please rcvicw the above mentioned items and consider including than in the letter to RKQ Homebuilders so that we don't have any <br /> ambigTuih•taking place. <br /> As you have previously indicated.. plcasc request the builder to take action in a specified time period upon when the repairs will be <br /> complete as damage is occurring to our property. along with.lxassiblc further damage to the mound system_ as tine goes om <br /> Please notify' us in writing as to what the C hN's tirue frame will lx=in order for the builder to make these repairs before citations will <br /> he issued along with a .fi_nal coin'of the letter to the builder. <br /> Sinc�rcly, <br /> ~like and Lori Arne <br />
The URL can be used to link to this page
Your browser does not support the video tag.