My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-00906 - septic
Orono
>
Property Files
>
Street Address
>
T
>
Townline Road
>
1180 Townline Road - 30-118-23-32-0001
>
Septic
>
2015-00906 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:27:20 PM
Creation date
6/27/2019 3:11:36 PM
Metadata
Fields
Template:
x Address Old
House Number
1180
Street Name
Town Line
Street Type
Road
Address
1180 Town Line Road
Document Type
Septic
PIN
3011823320001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,4 <br /> Joseph Olson D.B.A. <br /> Rusty Olson's--Soil and Percolation Testing <br /> Joseph J. Olson—MPCA License#810 <br /> 11481 Riverview Rd. NE, Hanover,MN 55341 <br /> (763) 498-8779 Fax(763)498-8290 <br /> THJS SYSTEM 1S DEStG1VED FOR <br /> August 10,2015 L BEDROOMS. ANY INCREASE IN NUMBER <br /> Michael Theis Estate QF BUMOMS INVAUDATES THIS DESIGN. <br /> 1180 Town Line Road <br /> Orono,Hennepin County <br /> This on-site Sewage Treatment System is designed for a Type 1 four-bedroom home in accordance with the <br /> Minnesota Pollution Control Agency Chapter 7080 and local ordinances. <br /> The periodically saturated soils were located at 18-20 inches(mottled soil). Due to the periodically saturated <br /> soils,a pressurized mound system will need to be installed to treat the septic effluent.The bottom of the <br /> treatment area must be located at least 3' above the saturated soils. <br /> The existing septic system does not conform to the state code chapter 7080 <br /> All neighboring wells are greater than 100' from proposed treatment areas. <br /> The soils at a depth of 12"have a percolation rate averaging 6 MPI. <br /> The existing septic tanks must be abandoned and a minimum two new 1300 gallon and 1000 septic tanks <br /> need to be installed. <br /> All new tanks need to be insulated if there is less than two feet of cover over the top of the tanks.Clean outs <br /> must be installed on the end of the laterals for maintenance. <br /> A 1000 gallon pumping chamber will need to be installed to lift the effluent to the treatment area.The power <br /> supply and switches must be located outside the manhole and pumping chamber in a weatherproof enclosure. <br /> A warning device must be installed with light and sound devices;this is in case of a pump failure.A flow <br /> measurement device must be installed.Including but not limited to a water meter,event counter,running time <br /> clocks or electronically controlled dosing. <br /> Nothina other than¢ray water (laundry,showers etc)Human water and toilet tissue should be <br /> disposed of into the septic tanks Garba¢e disposals are not recommended Additives must not be <br /> used. they may cause harmful damage to your septic system It is recommended that you pump the <br /> tank every two years for two septic tanks <br /> Sincerely, <br /> CITY OF ORONO <br /> SEPTIC PE IT PLA V <br /> JEW <br /> INSPECT R <br /> Joseph J. Olson VT <br /> �Z PERMIT NO. ZO( <br /> A PRO 'ED AS SUB.MITTFD <br /> APPROVED WITH C'ORRWTIONS AS 1\OTF.0 <br /> NOT APPROVED-C'ORREC'T& RESUBMIT <br /> These cotnments arc liar your inlorination. All work shall he done <br /> in full compliance with;,u api,llcahle septic and zoning code. <br /> Requirements inclndin)!items not specifically noted in this review. <br /> KLHI THIS PLAN SET OX Sffli AT A4L. I1.�11iS <br />
The URL can be used to link to this page
Your browser does not support the video tag.