My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-00906 - septic
Orono
>
Property Files
>
Street Address
>
T
>
Townline Road
>
1180 Townline Road - 30-118-23-32-0001
>
Septic
>
2015-00906 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:27:20 PM
Creation date
6/27/2019 3:11:36 PM
Metadata
Fields
Template:
x Address Old
House Number
1180
Street Name
Town Line
Street Type
Road
Address
1180 Town Line Road
Document Type
Septic
PIN
3011823320001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Mound Materials Worksheet UNIVERSITY <br /> Minnesota Pollution OF MINNESOTA <br /> Control Agency <br /> Project ID: v 03.19.15 <br /> A. Calculate Bed (rock)Volume:Bed Length J2.Q X Bed Width 2.8►X Depth =Volume ft' <br /> 50.0 ft X r 10.0 ft X 1.0 = 500.0 ft' <br /> Divide ft3 by 27 ft3/yd3 to calculate cubicyards: <br /> 500.0 j ft3 ; 27 = 18.5 yd3 <br /> Add 20%for constructability: 18.5 yd3 X 1.2 = 22.2 yd3 <br /> B. Calculate Clean Sand Volume: <br /> Volume Under Rock bed:Average Sand Depth x Media Width x Media len th =cubic feet <br /> 1.7 ft X 1 10.0 ft X 50.0 ft = 825.0 W <br /> For a Mound on a slope from 0-1% <br /> Volume from Length=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Length) <br /> ft -1) X I I X I ft = <br /> Volume from Width=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Width) <br /> ft -1) X X I = <br /> Total Clean Sand Volume: Volume from Length-Volume from Width-Volume Under Media <br /> ft3 - ft3 . it, <br /> For a Mound on a slope greater than 1% <br /> Upslope Volume:((Upslope Mound Height - 1)x 3 x Bed Length)-2=cubic feet <br /> (( 3.1 ft -1) X 3.0 ft X 50.0 )-2= 156.3 ft3 <br /> Downslope Volume:((Downslope Height- 1) x Downstope Absorption Width x Media Length)-2=cubic feet <br /> (( 3.8 ft-1) X 1 16.0 ft X 50.0 j )-2= 1113.3 ft3 <br /> Endslope Volume:(Downslope Mound Height- 1) x 3 x Media Width =cubic feet <br /> (1 3.8 ft-1 ) X 3.0 ft X 10.0 ft = 83.5 ft3 <br /> Total Clean Sand Volume:Upslope Volume -Downslope Volume +£ndslope Volume -Volume Under Media <br /> 156.3 ft3 - 1113.3 ft3 83.5 ft' - F 825.0 ft3= 2178.1 ft3 <br /> Divide ft''by 27 ft'/yd3 to calculate cubic yards: 2178.1 ft s 27 = 80•7 yd3 <br /> Add 20%for constructability: 80.7 yd3 x 1.2 96.8 yd3 <br /> C. Calculate Sandy Berm Volume: <br /> Total Berm Volume(approx):((Avg.Mound Height-0.5 ft topsoil)x Mound Width x Mound Le5th)-2=cubic feet <br /> ( 3.4 0.5 )ft X 41.0 ft X 74.0 )-2= 4453.7 ft3 <br /> Total Mound Volume-Clean Sand volume-Rock Volume=cubic feet <br /> 4453.7 ft3 2178.1 ft3 - 500.0 ft3 = 1775.6 ft3 <br /> Divide ft'by 27 ft3/yd3 to calculate cubic yards: 1775.6 f[' 27 = 65.8 yd3 <br /> Add 20%for constructability: 65.8 yd3 x 1.2 = 78.9 yd3 <br /> D.Calculate Topsoil Materia(Volume:Total Mound Width X Total Mound Length X.5 ft <br /> 41.0 ft X 74.0 ft X 0.5 ft = 1518.3 ft3 <br /> Divide ft'by 27 ft3/yd3 to calculate cubic yards: 1518.3 ft3 27 = 56.2 yd3 <br /> Add 20%for constructability: 56.2-7 yd3 x 1.2 = 67.5 yd3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.