My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-00906 - septic
Orono
>
Property Files
>
Street Address
>
T
>
Townline Road
>
1180 Townline Road - 30-118-23-32-0001
>
Septic
>
2015-00906 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:27:20 PM
Creation date
6/27/2019 3:11:36 PM
Metadata
Fields
Template:
x Address Old
House Number
1180
Street Name
Town Line
Street Type
Road
Address
1180 Town Line Road
Document Type
Septic
PIN
3011823320001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Mound Design <br /> UNIVERSITY <br /> Worksheet >1% Slope OF MINNESOTA , <br /> Control Agency <br /> 1. SYSTEM SIZING: Project ID: v03.19.15 <br /> A. Design Flow: GPD TABLE Ma <br /> B. Soil Loading Rate: 0.45 GPD/ft2 AM�M ATM 7M <br /> ,hn ns <br /> C. Depth to Limiting Condition: 1.5 ft <br /> Noir." a..vw�. <br /> r"�eoaMe"ae. LMS Ab <br /> ow &mks" r <br /> AINT <br /> D. Percent Land Slope: 4.0 % 01 ao. N"'w"" aw $bNo"" <br /> WdW) aw (role) aro <br /> E. Design Media Loading Rate: 1.2 GPD/ft2 .01 - 1 1 <br /> F. Mound Absorption Ratio: 01105 1.2 1 1.8 1 <br /> 1 b MNtl 0.8 2 1 1.8 <br /> TAM I "n0 Orr <br /> Ip s b" 0.78 1A 1 1.8 <br /> WOW 1a b 30 0.0 2 0.78 2 <br /> �W Tewm-do {A 311045 0A 2A 0.72 2 <br /> P11C MC As b so OAs 2.8 0.8 2.8 <br /> s 6Q1pf 1.0. 1.3.Lo.0.2.4.2.6 s 12 1 b 120 s 0.3 s 3 <br /> �12D <br /> 61-120nlpi OR 5.0 s12 Systems with these values are not Type I systems. <br /> i 120 nt*r >s.0• ss• Contour Loading Rate(linear loading rate)is a <br /> recommended value. <br /> 2. DISPERSAL MEDIA SIZING <br /> A. Calculate Dispersal Bed Area: Design Flow+Design Media Loading Rate-ft2 <br /> GPD + 1.2 GPD/ft2 = ft2 <br /> If a larger dispersal media area is desired, enter size: ft2 <br /> B. Enter Dispersal Bed Width: 10.0 ft Can not exceed 10 feet <br /> C. Calculate Contour Loading Rate: Bed Width X Design Media Loading Rate <br /> 10 ft2 X 1.2 GPD/ft2 = 12.0 gal/ft Can not exceed Table 1 <br /> D. Calculate Minimum Dispersal Bed Length: Dispersal Bed Area +Bed Width - Bed Length <br /> �ft2 <br /> + 10.0 ft = 50.0 ft <br /> 3. ABSORPTION AREA SIZING <br /> A. Calculate Absorption Width: Bed Width X Mound Absorption Ratio =Absorption Width <br /> 10.0 ft X 2.6 = 26.0 ft <br /> B. For slopes>1%, the Absorption Width is measured downhill from the upslope edge of the Bed. <br /> Calculate Downslope Absorption Width:Absorption Width - Bed Width <br /> 26.0 ft - 10.0 ft = 16.0 ft <br /> 4. <br /> DISTRIBUTION MEDIA: ROCK <br /> A. Media Volume:Medla Depth below and above pipe X Length X Width <br /> 0.75 ft X 50.0 ft X 10.0 ft= 375 ft3 + 27 = 14 yd3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.