My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-010276 - new septic system
Orono
>
Property Files
>
Street Address
>
T
>
Townline Road
>
1020 Townline Road - 30-118-23-32-0005
>
Permits/Inspections
>
1998-010276 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:27:24 PM
Creation date
6/26/2019 1:52:04 PM
Metadata
Fields
Template:
x Address Old
House Number
1020
Street Name
Town Line
Street Type
Road
Address
1020 Town Line Road
Document Type
Permits/Inspections
PIN
3011823320005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRESSURE DISTRIBUTION SYSTEM <br /> 1. Select number of perforated laterals _ <br /> 2. Select perforation spacing = r? ft. <br /> 3. Since perforations should not be placed closer than 1 ft. to <br /> the edge of the rock layer (see p. E-14),subtract 2 ft. from the <br /> rock layer length. <br /> .37 -2 ft. <br /> 4. Determine the number of spaces between perforations. <br /> Divide the length above by perforation spacing and round E-17a <br /> down to nearest whole number. <br /> --TABLE OFPERFORATION DISCHARGES INCPV <br /> Head Perforation diameter(inches) <br /> Length perf. spacing =3.r ft. +S ft. spaces 207- <br /> 1 4 <br /> (3) (2) t.oa o.A <br /> 1.5 0.90 <br /> 5. Number of perforations is equal to one plus the number of 2.ob 0.80 1.04 <br /> 2.5 0.89 1.17 <br /> perforation spaces . 3.0 0.98 1.28 <br /> 4.0 1.13 1.47 <br /> y5.0 1.26 1.65 <br /> spaces + 1 = /z perforations/lateral allse 1.0 foot of head for residential systems. <br /> bUx 2.0 feet of head for other establishments <br /> 6. Multiply perforations per lateral by number of laterals to <br /> get total number of perforations. E-17b <br /> J 12NrorM.Nw�rd�e=6 pre lff Wwau <br /> �10%Owsagv vwlr <br /> laterals x perfs/lateral- -34 perforations. ��a 1Z inch 1.5 inch 2.0 inch <br /> 2.5 14 18 28 <br /> 7. Determine required flow rate by multiplying 3.0 13 17 26 <br /> 3.3 12 16 25 <br /> number of perforations by flow per perforation 4.0 11 15 23 <br /> (see page E-17) 5.0 10 14 22 <br /> pals x a-/perf= zO gpm' E-15 <br /> -ma a rwrts,Tr <br /> 8. If laterals are connected to header pipe as shown on page E- <br /> 15,select minimum required lateral diameter from table on ..Y- <br /> page E-17;enter table with perforation spacing and number <br /> of perforations per later 1. Select minimum diameter for <br /> perforated lateral = 1 Ti inches. <br /> E-12 <br /> 9. If perforated lateral system is attached to manifold pipe near <br /> the center, as on page E-12, perforated lateral length and <br /> number of perforations per lateral will be approximately one <br /> half of that in step 8. Using these values,select minim <br /> diameter for perforated lateral from page E-17 as--/'Tot, <br /> inches. <br />
The URL can be used to link to this page
Your browser does not support the video tag.