My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01524 - gas line only
Orono
>
Property Files
>
Street Address
>
T
>
Tonkawa Road
>
1160 Tonkawa Road - 08-117-23-13-0007
>
Permits/Inspections
>
2016-01524 - gas line only
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:41:34 PM
Creation date
6/25/2019 11:33:39 AM
Metadata
Fields
Template:
x Address Old
House Number
1160
Street Name
Tonkawa
Street Type
Road
Address
1160 Tonkawa Rd
Document Type
Permits/Inspections
PIN
0811723130007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dec, 9. 2016 2:29PM PRACTICAL SYSTEMS No. 2659 P. 2 <br /> Cltyororono <br /> P.O.Box 66 <br /> 2750 Kelley Parkway <br /> Crystal Bay,MN 55323 <br /> Phow(952)249-4600 Fox(952)249-4616 <br /> CITY OF ORONO—MECHANICAL PERMIT <br /> kS HOS (All Commercial permils must be approved by d►e Building Official or lnspector and/or Fire Marshall) <br /> 1. You n-Ay apply for mechanical permits by mail or in person at the City offices. Applications will <br /> � <br /> be reviewed and a permit will be issued within two working days. <br /> 2. permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT <br /> VALID UNTIL.YOU RECEIVE A PERMIT, WORK MUST NOT BEGIN UNTIL THE <br /> PERMIT CAT2D IS POSTED ON TITIN.TOB SITIi. <br /> 3. Mechanical Desigfis—Complete calculations,details and specifications are required for each <br /> heating,ventilation,humidification-dehumidification,and air conditioning installation including <br /> heat loss/heat gain calculation,design temperatures,equipment ratings and identification as to <br /> type,manufacturer and nu)del. Data shall be presented on form provided. <br /> 4. When any new construction or remodeling is involved,a separate building permit must be <br /> obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code <br /> requirements. <br /> 6. All work must be inspected(rough-in and final). Can(952)2494600. <br /> (24-48 hour notice required) <br /> 7. House Heating Test Record must be submitted before final. <br /> Residential ❑Commercial(Approval Required) [Backflow Device:❑AVB ❑PVB) <br /> ❑New PfAdditional ❑Repairs ❑Replace <br /> Site Address: ( (/`-'" �Qn <br /> Owner: MC'44 I 4V�an Mailing Address: 1100 -TO A r0 ' <br /> city; Oro oo zip: <br /> Home Phone: Alternate Phone: <br /> Contractor; 1'l�. �� �'S S Contact Person: <br /> Address; q�qZ Y OG t p State Bond#: 00 IO <br /> City: J:j2PK;05 Zip5534 3 Expiration Date: / 1 /9 <br /> Phone: 95Z"7)) '�FNo Alternate Phone: <br /> ❑ Insurance—Current: y e S <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.