Laserfiche WebLink
(Ur:iated 2/12/01) <br /> CI' 1' OF ORONO APPLICATION FOR UTILITY PERMITS <br /> Box 66 (2750 Kelley Parkway) SEWERIWATER <br /> Crystal Bay,MN 55323 <br /> GENERAL INFORMATION <br /> 1. You may apply for utility permits by mail or in person at the City offices. <br /> 2. Mailed in applications are subject to the postage and handling fee shown below. Permit cards will be sent by <br /> return mail the same day the application is received. <br /> 3. Permits are not valid until you receive a permit card. <br /> 4. Work must not begin unless the permit card is available on the job site. <br /> 5. Utility connection permits may be issued to licensed contractors only. <br /> 6. Contact the Public Works Department (952-249-4600) for utility stub as-built locations. DO NOT <br /> EXCAVATE IN ANY STREET AND DO NOT TAP ANY MAIN without express approval of the Public <br /> Works Department. Issuance of a permit does not grant this approval. <br /> 7. All work must be done in accordance with State Code requirements. <br /> 8. All work must be inspected before it is covered. Call(952)249-4600. <br /> 24 hour notice required. <br /> 7i-9,r)4 JOB SITE ADDRESS: �/ )�u ` <br /> Occupancy Type: Residential Commercial <br /> Owner's Name: L/t Phone Number: �-Y7/- 5 _? <br /> Mailing Address: //yo° T�g 6wk City: 6fa"7 n Zip: <br /> Contractor's Name: o - Rdvr Phone Number: 7G3-Siy 3 !' <br /> Mailing Address: /YT 3v City:i9Q,*7ay1X, Zip:4_'Y <br /> KNIT TY <br /> Municipal Sewer Co ection ($35.00 per stub) $ <br /> inches; material Schedule 40 air tested; cast iron <br /> SAC Charge (2000 rate $1,150.00) must accompany all sewer permit applications unless prepaid. <br /> If not prepaid, a sewer connection permit will not be issued. <br /> Municipal Water Connection ($35.00 per stub) $ <br /> pipe size inches; material copper; other <br /> WATER METERS must be picked up and paid for at City Hall. <br /> Water meters must be set and sealed by Orono Water Department (952-249-4600) upon <br /> completion of meter installation. <br /> REQUIRED minimum setbacks from drain field and septic tanks=75' <br /> REQUIRED setback from sewer line=20' <br /> PERMIT FEE CALCULATION <br /> 1. Subtotal of above permit requested $ <br /> 2. State Surcharge $ .50 <br /> The State Building Code Division Surcharge of$.50 per permit must be <br /> included for each well,sewer and water connection permit requested. <br /> 3. Postage & Handling (Only mail-in applications) $ 1.50 <br /> 4. TOTAL PERMIT FEE (add lines 1-3 above) $ <br /> The undersigned hereby applies to the City of Orono for issuance of a Utility Permit, agrees to do <br /> all work in strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota,and certifies that all state ents made on this application are complete,true and correct. <br /> u- <br /> Signature of Applicant: Date: y�7 <br />