Laserfiche WebLink
Date Application Received:May 22,2019 <br /> Date Application Considered as Complete:June 6,2019 <br /> 60-Day Review Period Expires: August 29,2019 <br /> To: Chair Ressler and Planning Commission Members F j c,� <br /> Dustin Rief, City Administrator lkESHO <br /> From: Laura Oakden, Planner <br /> Date: June 17, 2019 <br /> Subject: LA19-000036, Brent Teele, 577 Park Lane, Variance, Public Hearing <br /> Application Summary: The applicant is requesting a hardcover variance <br /> Staff Recommendation: Planning Department Staff recommends the commission to review <br /> the practical difficulties. If the commission agrees with the findings, staff would recommend <br /> an approval of the request. <br /> Background <br /> The applicant is proposed an addition to the existing home. They are proposing to demolish an <br /> existing nonconforming detached garage.The new addition will consist of new garage stalls and <br /> upper living space. The proposed addition would meet all of the setbacks for the zoning district. <br /> The proposal includes a reconfiguration of hardcover, which exceeds 25%. The reconfigured <br /> hardcover will be less that the current levels. The application is requesting to maintain the same <br /> level of hardcover that is currently on the property. <br /> LOT ANALYSIS WORKSHEET <br /> Section 78-330-Setbacks: <br /> DISTRICT LR-1B Required Existing Home Proposed <br /> Addition <br /> Street 30' 50' 31.6' <br /> Side (north) 7.5' 2.1' (no change) 7.9' <br /> Side 7.5' 13.4' 8.9' <br /> Lakeshore 75' <br /> Average Lakeshore Met <br /> Section 78-330- Lot Area/Width: <br /> DISTRICT LR-1B Lot Area Lot Width <br /> Required 43,560 s.f. (1 acres) 140' <br /> Actual 9, 389 s.f. (0.21 acre) 50' @ 75'/ 50' @ OHWL <br /> Section 78-1403-Structural Building Coverage: <br /> Total Lot Area Total Structural Coverage <br /> 9, 389 s.f. (0.21 acre) Allowed: 2,000 s.f. <br /> Proposed: 1,997 s.f. <br />