Laserfiche WebLink
Updated Project Narrative <br /> The applicant is proposing to build an 80 foot by 40 foot building pad for the future construction of a <br /> sport court located on a private residence in the City of Orono. Construction activities will include <br /> importing fill, grading of the earthen building pad,and road access to driveway. Total land disturbance <br /> will be up to 11,000 s.f. of cutting and filling. Future construction on the building pad will consist of a <br /> sport court surface. Please refer to the attached site plan (Sheet 2). Construction and installation of <br /> these elements will permanently impact one Type 1 wetland,totaling 0.022 acres (958 sq.ft.) of <br /> wetland fill which we are replacing with 0.044 acres (1,9,16 sq. ft.) of wetland credits in Hennepin <br /> County. The total fill is 358 cubic yards, however the net borrow/import fill is 124 cubic yards. <br />