My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-17-2019 Planning Commission Packet
Orono
>
Planning Commission
>
2019
>
06-17-2019 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 8:40:55 AM
Creation date
6/18/2019 8:19:09 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Camp TEKO Hardcover Analysis <br /> PROPOSED HARDCOVER <br /> PER 1 - within 75-ft setback <br /> TOTAL PROPERTY AREA 801,054 s.f. <br /> PROPERTY AREA within setback 99,210 s.f. <br /> HARDCOVER length x width = s.f. <br /> Structure <br /> Swimming Beach Storage 140 s.f. <br /> Existing Tool Shed 6 x 8 = 48 s.f. <br /> Patio/Deck <br /> Existing Chapel Stage 118 s.f. <br /> Circulation <br /> Existing Compacted Pervious Paths 2,400 s.f. <br /> Trails <br /> Other <br /> Boating Beach docks N/A <br /> Existing Beach Stairs to Changing 260 s.f. <br /> Swimming Beach docks N/A <br /> Ex.Swimming Beach stone walls (retaining) 334 s.f. <br /> Total Hardcover (from area sum) 3,300 s.f. <br /> Percent Property Hardcover 3% <br /> TIER 1 - Percent Allowable Hardcover 25% <br /> *BLUE = new/modified items; included in totals <br /> Brandstetter Carroll, Inc. 6/13/2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.