Laserfiche WebLink
Improvements: <br /> The attachments detail the following planned improvements, and few additional <br /> improvements not called out in the 2018 Master Plan. All improvements shall be <br /> implemented using appropriate protection measures (silt fences, construction <br /> techniques). Please refer to the 2018 Master Plan Report Excerpt for the detailed <br /> descriptions of these elements and their functions. <br /> Phase I <br /> • Program Center &associated parking <br /> • Program Cabins &associated paths <br /> • Waterfront Improvements <br /> • Changing Rooms <br /> Future Phases <br /> • Welcome Center Pavilion <br /> • Maintenance <br /> • Entrance Parking/Arrival/Drop-Off <br /> • "The Bowl" <br /> • Arrow Cabin Renovation <br /> • Leader Lodge <br /> • Staff Parking <br /> • Pavilion <br /> • Program Platforms (Wood Decks) <br /> • Shelters <br /> • Toilets <br /> • Outdoor Programs <br /> • Trail and Path Network <br /> Phase I Improvements: <br /> The first phase of the Master Plan consists of the construction of the Program Center, <br /> its associated parking, 2 Program Cabins, the waterfront improvements, <br /> reconditioned beach trail, and Changing Rooms. These projects have been <br /> developed as described below. <br /> Program Center <br /> The Program Center will be located at the location of the existing sport court, <br /> just outside of the 100ft Primary Structure setback line at the west end of the <br /> property.The Main parking lot will be repaved and extended to allow for <br /> adequate parking space for this building and other Phase 1 functions. A 10ft <br /> wide, paved accessible route has been provided from this parking and drop- <br /> off area to the entrance and front porch of the building.This path will <br /> continue south to allow for accessible access to the Program Cabins,while <br /> also doubling as a vehicular access route for emergency vehicles. <br /> Page 2 of 10 <br />