Laserfiche WebLink
05/14/2013 TUE 12: 59 FAX 763 473 8565 Sabre Plumbing & Heating 2006/007 <br /> Note:All Geothermal Systems will now require a Site Plan&Review by our Building Official. <br /> IS THIS GEOTHERMAL? ❑Yes C]"N'o <br /> HEATING SYSTEMS <br /> Quantity: <br /> Make. <br /> Model: 4,1 Ooik( . <br /> Fuel: NL <br /> Flue Size: <br /> Input BTUs: <br /> Output BTUs: <br /> CFM: <br /> COOLING SYSTEMS <br /> Quantity: <br /> Make: Azur by 1.L\, <br /> Model: i*A042- <br /> eI <br /> Tons: <br /> H.Power <br /> FIREPLACES <br /> El Gas Factory Fireplace Brand Name: <br /> El Wood Burning Fireplace <br /> El Wood Stove Model No.: <br /> El Wood Stove with Flue/Masonry <br /> VENTILATION <br /> No. Kitchen Exhaust duct recirculating cfm <br /> ❑ No. Bath Exhaust(must have duct outside) dM <br /> ❑ No. Other Fans: Locations ofm <br /> FUEL STORAGE (Must be approved by byre Marshall if proposing to abandon lank in place) <br /> ❑ Installation ❑ Removal <br /> Fuel Oil: gallons ❑ Underground ❑Inside D Outside <br /> LP Gas: gallons <br /> Other: <br /> GAS LINE ONLY <br /> El Outdoor Grill E9/ Other/List What&Where: <br />