My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-005983 - demo
Orono
>
Property Files
>
Street Address
>
T
>
Tonkawa Road
>
1025 Tonkawa Road - 08-117-23-24-0003
>
Permits/Inspections
>
1994-005983 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:42:56 PM
Creation date
6/12/2019 2:29:00 PM
Metadata
Fields
Template:
x Address Old
House Number
1025
Street Name
Tonkawa
Street Type
Road
Address
1025 Tonkawa Rd
Document Type
Permits/Inspections
PIN
0811723240003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ORONO APPLICATION FOR DEMOLITION PERM-TT <br /> P.O. Box 66 (1335 So Brown Rd) <br /> �rystal B_ay, MN 55323 <br /> SPECIAL CONDITIONS & HOLD HARMLESS AGREEMENT <br /> seneral Instructions <br /> 1. You may be required to obtain other permits, i.e. burning, well <br /> abandonmment, etc. -: _ _ <br /> 2 . Work must not, begin unless the permit cardT.isyavailable on the job <br /> site. <br /> i . A 24 hour notice is required for all inspections. Call 473-7357. <br /> *fes****ttt***tf**fes**�*t�f***t***�* <br /> �I d✓o �'1i1/. <br /> "OB SITE ADDRESS: DZ� J v'v `l g �'`�" <br /> ;occupancy Type: <br /> Residential <br /> Commerc <br /> WNER'S NAME: 1/ ,e .way Z ���rs .ZV Phone <br /> Mailing Address:,n, r /5 Cit <br /> y� <br /> °ONTRACTOR'S NAME: r e S� � �e Bus. No. : <br /> City: of ✓o <br /> :iailing Address: -75 ,00 <br /> � <br /> 3emolition if planned by means of: ;C manual disassembly -heavy equipment <br /> burning (by fire department) <br /> ?ermits Issued: <br /> 4L Burning Fire Department <br /> Well Abandonment <br /> return for issuance of said Demolition Permit, the undersigned owner <br /> 'iereby agrees as follows: <br /> �. The structure(s) shall be kept enclosed and/or secured until such time <br /> as demolition is complete. <br /> Demolition debris will be kept off adjoining property and/or the <br /> _. public rights-of-way unless specific prior approval is obtained in <br /> writing for temporary use thereof. <br /> ? . Foundations shall be completely removed from the ground. <br /> 1. All demolition debris shall be completely disposed of off site in <br /> accordance with all applicable PCA requirements. <br /> 5 . Water wells must be abandoned in accordance with State Health <br /> Department regulations. <br /> 6. Inspection required when all debris has been removed , before <br /> backfilling. <br /> Within 5 working days of superstructure removal , a final inspection <br /> shall be requested. The site shall be left clean and clear of all <br /> debris, with any excavation filled with earth level with the adjacent <br /> ground elevation (except when such excavation is to be used as part of <br /> a new building and such new building is actually under construction). <br />
The URL can be used to link to this page
Your browser does not support the video tag.