My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01131 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
T
>
Tonkawa Road
>
1015 Tonkawa Road - 08-117-23-24-0002
>
Permits/Inspections
>
2014-01131 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:42:56 PM
Creation date
6/12/2019 1:14:03 PM
Metadata
Fields
Template:
x Address Old
House Number
1015
Street Name
Tonkawa
Street Type
Road
Address
1015 Tonkawa Rd
Document Type
Permits/Inspections
PIN
0811723240002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 F 0 R T E MEMBER REPORT MAIN Level, LIVING WINDOWS <br /> 2 piece(s) 13/4" x 9 1/2" 2.0E Microllam@ LVL <br /> Overall Length: 15 0 0 <br /> 0 0 <br /> 480 480 480 <br /> qq <br /> 0 <br /> All locations are measured from the outside face of left support(or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual <br /> Design Results Acdral m Location ANowed Result LDF Load:comwnanon(pattern) System:wan <br /> Member Reaction(lbs) 5988 @ 5 0 8 7613(3.00") Passed(79%) -- 1.0 D+1.0 S(Adj Spans) Member Type:Header <br /> Shear(lbs) 2216 @ 41 8 7265 Passed(30%) 1.15 1.0 D+1.0 S(Adj Spans) Building Use:Residel�rtial <br /> Moment(Ft-lbs) -2740 @ 5 0 8 13541 Passed(20%) 1.15 1.0 D+1.0 S(Adj Spans) Building Code:IBC <br /> Live Load Defl.(in) 0.019 @ 12 6 8 0.164 Passed(L/999+) -- 1.0 D+1.0 S(Alt Spans) Design Methodology cIASD <br /> Total Load Defl.(in) 0.028 @ 2 5 4 0.246 Passed(L/999+) - 1.0 D+1.0 S(AR Spans) <br /> •Deflection criteria:LL(L/360)and n(L/240). <br /> •Bracing(Lu):All compression edges(top and bottom)must be braced at 15 0 0 o/c unless detailed otherwise.Proper attadhment and positioning of lateral <br /> bracing is required to achieve member stability. <br /> Beating Loads to supports(lbs) <br /> supports Total Available Required tad Snow Trial Accessories <br /> 1-Trimmer-SPF 3.00" 3.00" 1.50" 804 1531 2335 None <br /> 2-Trimmer-SPF 3.00' 3.0D' 2.36" 2080 3908 5988 None <br /> 3-Trimmer-SPF 3.00" 3.00" 2.36" 2080 3908 5988 None <br /> 4-Trimmer-SPF 3.00" 3.00" 1.50' 804 1531 2335 None <br /> Tributary Dead Snow <br /> Loads Location VAdt h 0.90 1.15 Comments <br /> 1-Uniform(PSF) 0 0 0 to 15 0 0 1990 19.0 35.0 ROOF <br /> Weyerhaeuser Notes IIS)SUSTAINABLE FORESTRY INITIATIVE <br /> Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. <br /> Weyerhaeuser expressly disclaims any other warranties related to the software.Refer to current Weyerhaeuser literature for installation details. <br /> (www.woodbywy.com)Accessories(Rim Board,Blocking Panels and Squash Blocks)are not designed by this software.Use of this software is not intended to <br /> circumvent the need for a design professional as determined by the authority having jurisdiction.The designer of record,builder or framer is responsible to <br /> assure that this calculation is compatible with the overall project Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable <br /> forestry standards. <br /> The pmduct application,Input design Ioads,dimensions and support information have been provided by JEFF H <br /> Forte Software Operator Job Notes 8/6!2014 3:48:00 PM <br /> KyleMlB2er080614.3 Forte v4.5, Design Engine:V6.,1.1.5 <br /> Shaw Stewart Lumber Co. OSLO BUILDERS 080614.3 Oslo Pa'rt.4te <br /> 1612!238-4204 PARTEN REMODEL <br /> kmilitzerashawstewaniumberco.com Page Of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.