Laserfiche WebLink
4. TOTAL EXPOSED ROOF/CEILING CALCULATIONS: <br /> Total exposed <br /> roof/ceiling area . . . . . . . . . . . . ��`��. �D sq. ft. <br /> j) Total skylight area . . . . . . . sq. ft. x "U" <br /> k) Total roof/ceiling framing <br /> area (average 10%) . . . . . . . . sq. f t. x "U" .yZ1 s 5 <br /> 1) Total net insulated <br /> roof/ceiling area . . . . . . . . . sq. ft. x "U" <br /> TOTAL j) thru 1) <br /> If total of 014 is the same as, or less than 012, you have met the intent of <br /> S.B.C. Section 6606 (c) 1. <br /> ALTERNATE BUILDING ENVELOPE DESIGN <br /> To utilize the total enevelope system method, the values established by the sum of <br /> items #3 and 014 shall not be greater than the sum of items 011 and 012. <br /> 1 . + 2. _ <br /> 3. + 4. _ <br /> CERTIFICATION <br /> I hereby certify that I have calculated the "U" factors and "R" values herein and <br /> that the building here described meets or exceeds the Stant of Minnesota Energy <br /> Conservation Act. <br /> �1- 6'-(6�j La34 <br /> s <br /> (Signature) <br /> n <br /> (Date)T <br />