My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-13-2019 Council Minutes
Orono
>
City Council
>
2019
>
05-13-2019 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2019 7:17:57 AM
Creation date
6/11/2019 7:17:52 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br /> ORONO CITY COUNCIL MEETEING <br /> Monday,MAY 13,2019 <br /> 7:00 o'clock p.m. <br /> Barnhart indicated they would need to create a new outlot within the plat to extend the existing outlot and <br /> that there might be some modification to the property lines. <br /> Bollis stated in his view it would require a variance from the Watershed and that it could be avoided by <br /> using the hammerhead. <br /> Printup commented there appears to be a couple of different options and that perhaps the applicant could <br /> come up with a couple of different options the City Engineer could review. <br /> Barnhart noted this is preliminary plat and that there will be a final plat. The Planning Commission will <br /> not see the final plat. The City Council could provide direction to the applicant asking him to address that <br /> question,they could send it back to the Planning Commission, or they could direct the applicant to design <br /> a cul-de-sac that meets the requirements. <br /> City Attorney Mattick stated while it is called a preliminary plat, it is best to have a firm hand on what is <br /> being proposed as opposed to being unsure what concept will ultimately be decided upon. <br /> Walsh commented he would be comfortable with a cul-de-sac solution that Staff supports. <br /> Bollis indicated he is happy to include a cul-de-sac if it fits. <br /> Barnhart recommended the application be tabled until the cul-de-sac issue is resolved. <br /> Printup moved,Crosby seconded,to table Application No.LA19-000018,Chris and Rachel Bollis, <br /> 350 Stubbs Bay Road North. VOTE: Ayes 5,Nays 0. <br /> 26. LA19-000092—WILLIAM AND SUE DUNKLEY,PENCE LANE ADDITION <br /> VIOLATION <br /> Curtis stated the final plat approval for the Pence Lake Addition was granted by the City Council in <br /> November 2018,which was recorded with Hennepin County in February 2019. According to Conditions <br /> 4 and 6 on Page 3 of the final plat resolution, access to or from Lot 1 over Lot 2 is prohibited. The <br /> prohibition was effective the date of the plat recording. The Code allows two properties to share a <br /> common driveway. A third property accessing a private driveway is not permitted since the third <br /> driveway triggers the need for a private platted road. <br /> The developer has stated their desire to enter the property over the Pence Lane roadway on a number of <br /> occasions. Therefore,with this plat,a condition was placed in the resolution prohibiting access to or from <br /> Lot 1 over Lot 2. The prohibition became effective on the date of the plat recording. <br /> Staff has received a number of complaints regarding construction traffic serving Lot 1 over Lot 2. In <br /> response, Staff sent a letter on March 25 reminding the property owners of the prohibition and the plat <br /> conditions of approval. Additional complaints were received resulting in a letter being sent dated April <br /> 24 and the scheduling of this meeting to discuss a solution or revocation of the plat. <br /> At this time Staff is seeking guidance on the best way to address this issue. <br /> Page 8 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.