My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-13-2019 Council Minutes
Orono
>
City Council
>
2019
>
05-13-2019 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2019 7:17:57 AM
Creation date
6/11/2019 7:17:52 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br /> ORONO CITY COUNCIL MEETEING <br /> Monday,MAY 13,2019 <br /> 7:00 o'clock p.m. <br /> In addition,there is also construction going on on Pence and those vehicles are allowed to use the Pence <br /> Lane road. Vogstrom stated in his view he has done his due diligence as far as not having anyone come <br /> in there and that he does not believe it is an issue anymore. <br /> Sue Dunkley, 2709 Walters Port, stated an example of how tough they are trying to be is a gentleman <br /> pulled in the other day with a trailer, pulled straight ahead, and the guys quit their work and went out of <br /> the house immediately to warn him. The guy had to back all the way down into Mr. Crosby's driveway. <br /> Vogstrom commented they are taking it seriously. <br /> Dunkley noted the same subcontractors are being used on Eric's project and that they can take as many <br /> pictures as they want but she does not know if they have the time to do that. Dunkley stated she is not <br /> sure whether the City would like the contractors to sign in as they enter the property or how they would <br /> like them to deal with it. At this time their addition is almost done. Dunkley noted they have paid <br /> approximately$38,000 to the City in fees for this project as well as park dedication fees and that they <br /> have paid taxes for 35 years but they are acting like they are criminals. At the present time all <br /> construction traffic is coming down Walters Port. <br /> Walsh noted construction traffic for the Dunkleys' project must go down Walters Port but that the <br /> construction traffic for Eric Vogstrom's project can go down either Pence or Walters Port. <br /> Vogstrom stated most have come down Walters and that they are taking this seriously. <br /> Dunkley stated the subcontractors have all been talked to. <br /> Crosby stated as someone who lives in the area,he believes they have gone to good effort with the <br /> signage but sometimes construction people do not follow instructions. Crosby suggested they perhaps <br /> have someone blow the roads clean every week. <br /> Crosby suggested Eric have the subcontractors drive down Pence for his project and that he should also <br /> think about having some type of turnaround for vehicles. Crosby stated while the signs are clear as day, <br /> not everyone follows instructions. <br /> Vogstrom stated now that the road restrictions have been lifted,they have removed a big pile of dirt, <br /> which provides more of a turn-around. <br /> Walsh asked if anything else has occurred in the last three weeks. <br /> Curtis indicated she has not received any reports from the City inspectors or neighbors. <br /> Printup stated there are a couple of things going on here. The contractors do not live here but they are <br /> here to do a job and do not necessarily follow instructions. Printup commented this does not come as a <br /> surprise. <br /> Crosby stated the signage is large and in his view they have gone to great lengths to mitigate the issues. <br /> Greg Hueler,2715 Pence Lane, stated he appreciates their adherence to City Code on the Bollis <br /> application, but that he is not sure where things went awry with this application since the City Code <br /> Page 10 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.