Laserfiche WebLink
8-7 Thursday. Sunny. <br /> LOT CLEARING. Ingram (612-685-0109)mobilized at 8:30 with a bobcat. Two-man <br /> crew consolidated stairs and debris from around site. Todd was there hauling and cutting, <br /> and supervised. Worked alongside them with his chains to pull stairs apart. <br /> DRAIN TILE TO LAKE AND SEWER LINE. Shawn said old survey showed a clay tile <br /> installed by the City from low area to lake—through the lot. She thought when the gas <br /> line was shut off that someone dug through it and blocked it—thought it was 6-7 feet <br /> down. We need to know routes of this line, as it is needed, as well as the route of the <br /> SEWER LINE—prior to further excavation. She thought Sven might have some <br /> knowledge. She is looking for the old survey that showed the clay drainage tile to the <br /> lake. I will fax this info to Robert Merila(turned out to be confused with the sewer). <br /> MCWD. Shawn will stop by and sign MCWD application. Updated Shawn via phone on <br /> the MCWD start—don't start issue. <br /> SILT FENCE. Have materials in Stonewood stock for SDB installation. Discussed <br /> installation scheduling and plan with Andy McLain—he will contact me to walk the site. <br /> Will install per normal regulations <br />