Laserfiche WebLink
Fees to be Charged YES NO <br /> Permit <br /> Plan Review <br /> State Surcharge <br /> Investigation Fee <br /> SAC-Number of SAC Units <br /> Other(specify) <br /> Square Footage $ per Square Footage <br /> Basement X = $ <br /> 1st Floor X = $ <br /> 2nd Floor X = $ <br /> Garage X = $ <br /> Estimated Construction Value: $ <br /> Orono Inspections Required Work Requiring Separate Permits <br /> Footing O Site Plumbing 0 Grading/Filling <br /> `l2�Poured Wall X Silt Fence/Erosion Control Mechanical 0 Fire <br /> Foundation Survey 0 Hardcover Removal Fireplace E' Water Connection <br /> O Framing 0 Other(specify) 0 Masonry � Sewer Connection <br /> Waterproofing/Drain tile )I Mfg. 0 Lawn Irrigation <br /> 0 Foundation Waterproofing 0 Other(specify) 0 Landscaping <br /> Framing 0 Septic <br /> Insulation <br /> As-Built Survey <br /> 'WFinal <br /> Lathe Required State Permits <br /> 0 Other(specify) <br /> 0 Well Electrical <br /> REMARKS (in-house): <br /> OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED: <br /> 0 See Builder Acknowledgement Form <br /> 0 Prior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. <br /> Updated: June 2017 <br /> z:\forms\plan review checklist 06-2017.docx <br />