Laserfiche WebLink
Component Constructions Job: Ho80917MENZEL <br /> WrightsofC p Date: Aug 09,2017 <br /> sports room By: MIKE ROVVE <br /> Goodin Company <br /> 2700 2nd street north,Minneapolis.MN 55411 Phone:612-586-7811 Fax 6125884132 Email:mike.rowafpoodhwo.com Wetr.www.goo*vco.com <br /> Project1 • <br /> For: MENZEL, LEWIS HEATING&AC <br /> ORONO, MN <br /> Design Conditions <br /> Location: Indoor: Heating Cooling <br /> Minneapolis/St. Paul, MN, US Indoor temperature(°F) 72 75 <br /> Elevation: 837 ft Design TD (°F) 87 13 <br /> Latitude: 45°N Relative humidity(%} 5 50 <br /> Outdoor: Heating Cooling Moisture difference(gr/Ib) 3.9 28.5 <br /> Dry.bulb(°F) -15 88 Infiltration: <br /> Dally range(°F) - 19 ( M ) Method Simplified <br /> Wet bulb(° - 72 Construction quality Tight <br /> Wind speed(mph) 0 0 Fireplaces 1 (Average) <br /> Construction descriptions Or Area U-value insul R Htg HTM Loss Cig HTM Gain <br /> r BtuhAFLT R-'FA34uh 8VhV 81uh BluhAP 91uh <br /> Walls <br /> Rim Joist,wd ext 18'R-14 ENTER LINEAL FOOT Rim Joist,wd se 42 0.047 21.0 4.08 172 0.94 39 <br /> ext 18"R-21 ENTER LINEAL FOOT <br /> Bg wall,light dry soil,2"x4"wood int frm,concrete wall,r-10 ins,8" s 270 0.017 11.0 1.47 397 0 0 <br /> thk,1/2"gypsum hoard int fish:Bg wall,light dry soil,2"x4"wood w 394 0.017 11.0 1.47 579 0 0 <br /> Int frm,concrete wall,r-10 ins,8"thk,1/2"gypsum board Intfnsh n 270 0.075 11.0 6.53 1762 1.50 406 <br /> all 934 0.039 19.0 2.93 2738 0.43 406 <br /> Pardtions <br /> (none) <br /> Windows <br /> (tee) <br /> Doors <br /> (none) <br /> Ceilings <br /> (none) <br /> Floors <br /> Bg floor,light dry soil,6.5'depth:Bg floor,light dry soil,6.5'depth 649 0.090 11.0 3.91 2538 0 0 <br /> W1 i ft0ft* RightSuilsO Universal 2013 13.0.15 RSUIS012 201714+9 09 13:43:27 <br /> ■ <br /> Page 4 <br /> AM Project2.rup Cal -MJ8 Front Door faces: E <br />