My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-P09379 - demo
Orono
>
Property Files
>
Street Address
>
T
>
Tonkawa Road
>
0774 Tonkawa Road -05-117-23-34-0009
>
Permits/Inspections
>
2005-P09379 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:14:24 PM
Creation date
6/10/2019 10:28:38 AM
Metadata
Fields
Template:
x Address Old
Address
0774 Tonkawa Rd
Document Type
Permits/Inspections
PIN
0511723340009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> CITY OF ORONO APPLICATION FOR DEMOLITION PERMIT <br /> P.O. Box 66 (2750.Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> SPECIAL CONDITIONS & HOLD HARMLESS AGREEMENT <br /> General Instructions <br /> 1. You may be required to obtain other permits, i.e. well abandonment, etc. <br /> 2. Work must not begin unless the permit card is available on the job site. <br /> 3. A 24 hour notice is required for all inspections. Call (952) 249-4600. <br /> JOB SITE ADD SS: <br /> Occupancy TypeResidential Commercial <br /> OWNER'S NAME: A` Y Phone: 9fS7 <br /> Mailing Address: f.;,ri Al City: j,hn� iJ q <br /> CONTRACTOR'S NAME: o, / L Bus.No.: &,-,1-.21d- <br /> Mailing <br /> ~7Ya7► <br /> Mailing Address: ,f r - City: 46 <br /> Demolition if planned by means of: manual disassembly <br /> heavy equipment <br /> Permits Issued: <br /> # Well Abandonment <br /> In return for issuance of said Demolition Permit, the undersigned owner hereby agrees as follows: <br /> 1. The structure(s) shall be kept enclosed and/or secured until such time as demolition is <br /> complete. <br /> 2. Demolition debris will be kept off adjoining property and/or the public rights-of-way unless <br /> specific prior approval is obtained in writing for temporary use thereof. <br /> 3. Foundations shall be completely removed from the ground. <br /> 4. All demolition debris shall be completely disposed of off site in accordance with all <br /> applicable PCA requirements. <br /> 5. Water wells must be abandoned in accordance with State Health Department regulations. <br /> 6. Sewer and water must be disconnected at the services at the street by qualified contractors. <br /> 7. Inspection required when all debris has been removed,before backfilling. <br />
The URL can be used to link to this page
Your browser does not support the video tag.