Laserfiche WebLink
PLAN REVIEW CHECKLIST FOR NEW STRUCTURES / ADDITIONS <br /> �/�ma <br /> Address: �./ �(��L�Q wQ /� Permit No.: <br /> Description of work: Date Recd: <br /> Septic review by: Date Approved: <br /> Zoning review by: Date Approved: <br /> Building review by: Date Approved: jg <br /> Grading review by: Date Approved: <br /> Zoning District: Zoning File#: Reso#: Reso Date: <br /> Zoning: Lot Area: SF/AC Width: Lot verage: SF aha <br /> Survey Submitted: 0 Yes 0 No Date of Survey: Revised date(?)' <br /> Landscape plan submitted? Yes 0 No Landscaper• <br /> Pro osed Setbacks: <br /> Front (Lake) Rear(Street) ( N S E W ) ( N S E W ) Other Buildings Wetland <br /> Side Side <br /> Defined Height: Peak eight: FFE: FFE minus 6 feet= (Existing Contour <br /> Perimeter(linear feet)= 50°0= L.F. below grade <br /> Basement? 0 Yes 0 No, Stor' s <br /> FOR A BUILDING WITH A BASEMENT OR CRAWL P CE: FOR A BUILDING ON A SLAB FOUNDATION: <br /> The distance be en the lowest proposed Slab at or above grade— <br /> START W ITH floor(of the base nt or crawl space)and measure from highest existina <br /> the highest poi of a roof. START WITH grade to the highest point of the <br /> roof even if fill was brought in to <br /> If you have ... elevate home. <br /> SUBTRACTION • GAB OR HIP ED ROOF(no Slab below grade—measure <br /> (BASED ON win ws): Subtr ct half the distance from highest existing grade to the <br /> ROOF TYPE) be een the high st point of the roof highest Point of t e roof. <br /> to a low point of he corresponding If you have a... <br /> g ble or hipped ro • GABLE OR HIPPED ROOF <br /> SUBTRACTION <br /> • ABLE OR HIPPE ROOF with (BASED ON (no windows): Subtract half <br /> ndows): Subtract alf the distance ROOF TYPE) the distance between the <br /> between the top of th highest highest point of the roof to <br /> window and the highe t point of the the low point of the <br /> roof corresponding gable or <br /> hipped roof <br /> • ALL OTHER ROOF TY ES(flat, GABLE OR HIPPED ROOF <br /> mansard,etc):No subtr tion. (with windowls): Subtract <br /> SUBTRACTION ubtract the distance between a half the distance between <br /> (BASED ON asemenUcrawl space floor and he the top of the highest <br /> EXISTING ighest existing grade adjacent U the window and the highest <br /> GRADES) rundation OR 10 feet(whichever's less). point of the roof <br /> • ALL OTHER ROOF TYPES <br /> (flat,mansard,etc):No <br /> EQUALS efined building height subtraction. <br /> EQUALS Defined building height <br /> Updated: October 2015 <br /> z:\forms\plan review checklist 10-2015.docx <br />