Laserfiche WebLink
FLAN REVIEW <br /> ,,CHECKLIST FOR NEW STRUCTURES / ADDITIONS <br /> T55Address: � 1 Uflua= _W Permit No.: 2z 1(0 « W r1 4 <br /> Description of work: aginb2 S� Date Rec'd: I - Z.(p•((Q <br /> Septic review by: Yv to Date Approved: <br /> Zoning review by: Date Approved: <br /> Building review by: �— Date Approved: <br /> Grading review by: Date Approved: <br /> Zoning District: -� Zoning File#: Reso#: Reso Date: <br /> Zoning: Lot Area: Z, 21 SF 4 A Width: Lot Coverage: SF % <br /> Survey Submitted: 9Yes ❑ No Date of Survey: T Mi W Revised date(?): 13. 2 l ' L5 <br /> Landscape plan submitted? ❑ Yes ❑ No Landscaper: <br /> Proposed Setbacks: <br /> FLake) <br /> &ar(Street) ( N S E W ) ( NIde <br /> E W ) Other Buildings Wetland <br /> Side <br /> �— I q' <br /> t 'Mk •a- aPPIOV i 2• r r rs <br /> Defined Height: Peak Height: FFE: FFE m s 6 feet= (Existing Contour; <br /> Perimeter (linear f t) = 50%_ / L. . below grade <br /> Basements Yes ❑ No, Stories <br /> FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: FOR A BUILDING ON A SLAB FOUNDATION: <br /> The distance between the lowest proposed Slab at or above grade— <br /> START WITH floor(of the basement or crawl pace)and measure from highest existing <br /> the highest point of the roof grade to the highest point of the <br /> START WITH roof even if fill was brought in to <br /> i <br /> If you have a... elevate home. / <br /> SUBTRACTION • GABL OR HIPPED ROOF(no Slab below grade—measure <br /> (BASED ON windows): Subtract half the distance from highest existing grade to the <br /> ROOF TYPE) between the highest point of the roof highest point of the roof. <br /> to the low point of the corresponding If you have a... <br /> gable or hipped roof SUBTRACTION GABLE OR HIPPED ROOF <br /> • GABLE OR HIPPED ROOF(with (BASED ON (no windows): Subtract half <br /> the distance between the <br /> windows): Subtract half the distance ROOF TYPE) highest point of the roof to <br /> between the top of the highest the low point of the <br /> window and the highest point of the <br /> roof corresponding gable or <br /> hipped roof <br /> • ALL OTHER ROOF TYPES(flat, GABLE OR HIPPED ROOF <br /> mansard,etc):No subtraction. (with windows): Subtract <br /> SUBTRACTION Subtract the distance between the half the distance between <br /> (BASED ON basement/crawl space floor and the the top of the highest <br /> EXISTING highest existing grade adjacent to the / window and the highest <br /> GRADES) foundation OR 10 feet(whichever is less), point of the roof <br /> • ALL OTHER ROOF TYPES <br /> (flat,mansard,etc):No <br /> EQUALS Defined building height subtraction. <br /> Defined building height <br /> EQUALS <br /> Updated: May 2016 <br /> z:\forms\plan review checklist 5-2016.docx <br />