My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-00281 - lower level water damage repair
Orono
>
Property Files
>
Street Address
>
T
>
Tonkawa Road
>
0746 Tonkawa Road- 05-117-23-34-0005
>
Permits/Inspections
>
2009-00281 - lower level water damage repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:14:12 PM
Creation date
6/7/2019 9:54:16 AM
Metadata
Fields
Template:
x Address Old
Address
0746 Tonkawa Rd
Document Type
Permits/Inspections
PIN
0511723340005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> • Replace the laminate sill at the quad window and the upper window in the living room <br /> and the quad window in the dinette area. <br /> • Add a stool and apron style primed ranch casing to the interior of the sun room window. <br /> • Add a primed finger joint extension jamb to the interior and install primed ranch stool <br /> and apron style trim to the interior of the window. <br /> • Add ranch pine casing to the interior of the main floor bath window. <br /> Electrical: <br /> • Replace the make-up light at the vanity. <br /> • Extend the well line and shorten the home run from the circuit panel, and reconnect the <br /> well switch. The existing GFI outlet on the knee wall will be used for the water softener. <br /> • Add 6 recessed cans to the ceiling of the living room with a dimmer. <br /> Plumbing: <br /> • Connect the existing vanity sink waste and water supply. <br /> • Disconnect the toilet prior to the framing and reset after the painting is completed. <br /> • Add new floor drain for the water softener, replace the floor drain at the laundry area. and <br /> tie into the main waste line from the bathroom area. Move the water and drain lines for <br /> the water softener, and the main feed as necessary. <br /> Painting: <br /> • Kitchen: <br /> o No work <br /> • Dining room: <br /> o Enamel the crown mold, chair rail, base and window. <br /> o Paint the walls and ceiling. <br /> • Living room: <br /> o Enamel the crown mold, chair rail, base, <br /> o Paint the walls and ceiling. <br /> • Bedroom: <br /> o Enamel the chair rail, and base. <br /> o Paint the walls. <br /> o Paint the interior and the exterior filler pieces of the egress window. <br /> • Hallway: <br /> o Enamel the base. <br /> o Paint the walls. <br /> • Furnace room: <br /> o No work <br /> • Bathroom: <br /> o Enamel the base, door(to hallway), and casing. <br /> o Paint the walls. <br /> • Office: <br /> o Enamel the base, 2 doors (closet, door to back hallway), and casing. <br /> o Paint the walls. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.