Laserfiche WebLink
4 <br /> I <br /> Address: 7 Z O Tv,c,.,trA44,,19 /1 OA D e"00'( 7 /H 1OD C.E"TOrV� Date: 7-12 <br /> Prepared by: 6:'-/1 0�y,8 ERc= /1 ffGC/A TEI, �,vc. RECEIVED <br /> HARDCOVER CALCULATION WORKSHEET AUG 2 3 2012 <br /> SETBACK ZONE: (CIRCLE ONE) 0-75' 75-250' 50-500' 500-100CIT1(OF ORONO <br /> EXISTING HARDCOVER IN ZONE <br /> A. House x = /S8 S.F. <br /> Length Width <br /> X = S.F. <br /> X = S.F. <br /> B. Garage x = 720 S.F. <br /> C. Driveway x = 9'75 S.F. <br /> C 61 Al C. 4 PA on, x = 3 4 S.F. <br /> D. Sidewalk Co4-•c 136 t Pit vrlts 4 9/ x = 6 2 7 S.F. <br /> Ar rro x = 6 S.F. <br /> E. Patio/Deck x = 2 R 4• S.F. <br /> I rw,k r ro x = 24 S.F. <br /> F. Landscape x = /80 S.F. <br /> Underlain x = S.F. <br /> By Plastic x = S.F. <br /> G. Retaining Walls x = 12 5 S.F. <br /> H. Other x = S.F. <br /> TOTAL HARDCOVER W ZONE - 400l S.F. A <br /> TOTAL PROPERTY AREA IN ZONE 9772 S.F. B <br /> A 4001 + B 19772- x 100 = 45, d'/ % <br /> PROPOSED HARDCOVER INTONE (including existing hardcover to be retained) <br /> A. House x = S.F. <br /> Length Width <br /> X = S.F. <br /> X = S.F. <br /> B. Garage x = S.F. <br /> C. Driveway x = S.F. <br /> X = S.F. <br /> D. Sidewalk x = S.F. <br /> X = S.F. <br /> E. Patio/Deck x = S.F. <br /> X = S.F. <br /> F. Landscape x = S.F. <br /> Underlain x = S.F. <br /> By Plastic x = S.F. <br /> G. Retaining Walls x = S.F. <br /> H. Other x = S.F. <br /> TOTAL HARDCOVER IN ZONE - S.F. A <br /> TOTAL PROPERTY AREA IN°,.ZONE - S.F. B <br /> A + B x100 = % <br /> -21 - <br />