Laserfiche WebLink
Fees to be Charged YES NO <br /> Permit <br /> Plan Review v' <br /> State Surcharge <br /> Investigation Fee <br /> SAC—Number of SAC Units <br /> Other(specify) (� <br /> Square Footage $ per Square Footage <br /> Basement X = $ <br /> 1 s' Floor X = $ <br /> 2nd Floor X = $. <br /> Garage X = $ <br /> Estimated Construction Value: $ 171 3 <br /> Orono Inspections Required Work Requiring Separate Permits <br /> Footing ❑ Site ❑ Plumbing ❑ Grading/Filling <br /> ❑ Poured Wall ❑ Silt Fence/Erosion Control ❑ Mechanical ❑ Fire <br /> ❑ Foundation Survey ❑ Hardcover Removal ❑ Fireplace ❑ Water Connection <br /> ❑ Framing ❑ Other(specify) ❑ Masonry ❑ Sewer Connection <br /> ❑ Waterproofing/Drain tile ❑ Mfg. ❑ Lawn Irrigation <br /> ❑ Foundation Waterproofing ❑ Other(specify) ❑ Landscaping <br /> Framing ❑ Septic <br /> ❑ Insulation <br /> ❑ As-Built Survey <br /> Final <br /> ❑ Lathe Required State Permits <br /> ❑ Other(specify) <br /> ❑ Well ❑ Electrical <br /> REMARKS (in-house): <br /> OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED: <br /> ❑ See Builder Acknowledgement Form <br /> T rior to release of escrow money an ac hl lilt ci irvam_2nd h.-Lr COVA�ralrulatinnc mi ice+ ILL - - ^d. <br /> Qr�olS ►n�u�trf- (�— r�.- ��ec�i� �� VC�I��. <br /> Updated: June 2017 <br /> z:\forms\plan review checklist 06-2017.docx <br />