Laserfiche WebLink
FILE No.643 07/01 '03 14:04 ID:PLYMOUTH PLUTING FAX:7635331121 PAGE 5/ 6 <br /> Part B. DEPRESSURIZATION PROTECTION <br /> Check option used: tic Fuel burning equipment (complete schedules below) ❑ No fuel burning equipment <br /> INSTRUCnONS EXRAUST f MAJa-Up AIR SCHEDULE* <br /> Step i. Complete the Combusnon Egrtipmenr Schedule below. Only equipment Exhaust devices over 300 cfm T Flow <br /> with a Y(Yes)may be selected under the"Category 1"alternate. EEcfnt <br /> Sirp?- Complete S.rhausr/Make-up Air Schedule on the right if direct or power cftn <br /> tented or solid fuel atmospheric vent space heating equipment is selected. cfm <br /> COMBUSTION EQUIPMENT SCHEDULE <br /> (cheek all types proposed) <br /> Space heating—nonsolid fuel Scaled combustion dv <br /> Hearth — nonsolid fuel 4 Sealed combustion Y <br /> A Direct or power vented Direct or poK er rented 1' <br /> Atmospherically vented Armosphericaily vented N <br /> water heating—nonsolid fuel C2 Sealed combustion Space heating solid foci E3rm <br /> Aosphericalh veined 1'` <br /> Direct or power vented Wam heating—solid fuel ❑ .atmospherically vented Y <br /> Atmospherically vented I N 1 Hearth—solid feel O Atmo hcriea)h vemed Y <br /> If amvsphmically vcuted•solid fuel or direct or power vetted nonsolid fiuei space heating it insMUed,then make-up air to thatch <br /> flow is required for each individuail exhaust drvioc which exceeds 300 cubic feet per minute. <br /> Part Cr. 'V•ENTILATION <br /> ITENTILATION QIJArMTY <br /> (Mechanical ventilation must be provided per the larger quantity calculated below) <br /> c y ' cubic feet z 0,005$3/minute. ® cfm ( � x I6 cftnlbedroom)+25 cfm T l 11 1 cfm <br /> volume of habitable rooms number ofbcdrooms <br /> VENTILATION FAN SCAEI)ULE <br /> Check,method(s)proposed + 9D Exhaust only Balanced (heat recovery ventilator air cxchantter.etc.) <br /> Fan description or location 3 TOTALS <br /> VE)IMLATION Intake cfm cfm 29 cfm cfm cfm <br /> A$DESIGNED Exhaust cfm Hca cfm c$m cfm Im qcfm <br /> Statement of Compliance: The proposed building design represented in these documents is consistent with the building: plans, <br /> specifications. and other calculations submined with the permit application. The proposed building has been desicned to meet the <br /> requirements of the Minnesota Energy Code, <br /> Applicant iipprtnt name) na re _v3 r � <br /> VENTILATION <br /> qtr Telephone murnber, <br /> Part C?. Y ENTILATION (Submit Part C2 upon cpmpletion of system verificationt) <br /> - --.--- -------- •.---.------- -- ----------------------------------- ------- <br /> Joh Site Address: Permit Number <br /> Pan description or location TOTALS <br /> )VIEASURED Intake aim cfm cfm cfm cfm <br /> PER,FORMANCE�t Zxhaust cfm cfm cfm c m cfm <br /> T Ventilation rate must be measured and verified when the performance option is used in lieu of the prescriptive option for the sealing <br /> of joints in the building"conditioned envelope(from Part A). <br /> Compliance Statement: Installed ventilation sysrern is in cnnlphancr with.mNE-nertiv Code and rc sized to provide the dest n au t)is%% <br /> \hplrcarnt thrum nailts•t Srgnarurr fair IctC)thtsnr numhri — <br />