Laserfiche WebLink
L <br /> �H*AUGo <br /> ALO 1/10/14 <br /> SERVICESi Daily Soil Observation Notes <br /> Project No: ''� d �' Date: Report No: <br /> Project N; mee: Project Location: 4; d <br /> Client: 6A,#l Temp/Weather: b P, 6e'# k <br /> Project Manager: c-o" Time Arrived: Departed: <br /> Soil Observation <br /> Areas Observed: ❑ Building Pad use Pad [—]Roadway ❑Parking/Walks ooting <br /> ❑Proof Roll ❑Other(describe): <br /> Soil report available? ❑ Yes No Report reviewed? Yes ❑No Report prepared by: <br /> Finish floor evaluation: Bottom of footing elevation: r' Bottom of excavation elevation: <br /> III Of <br /> Approved plans available? 121yes ❑No Specified compaction: r— Fill source: <br /> Oversizing appears adequate? NA ❑Yes ❑No Soils observed agree with Soils report?/?A <br /> eport? ❑Yes ❑No <br /> Soils appear adequate for design loads? Yes ❑No Proposed project bearing capacity(psf): 040W <br /> Contractor notified of results? es ❑No Name of person notified: Yr r <br /> Was a copy of this report left on site? es ❑No If so,whom was it submitted to? <br /> Notes/Comments: U / Q <br /> SIC 61i <br /> Performed By: eviewed By: Date: <br /> This is a preliminary report and is provided solely as evidence that field observations and/or testing was performed.Observations and/or conclusions and/or <br /> recommendation conveyed in the final report may vary from,and shall take precedence over,those indicated in a preliminary report. <br />