My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-01168-VOIDED
Orono
>
Property Files
>
Street Address
>
T
>
Tonkawa Road
>
0650 Tonkawa Road - 05-117-23-33-0005
>
Permits/Inspections
>
2010-01168-VOIDED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:13:23 PM
Creation date
6/3/2019 9:25:48 AM
Metadata
Fields
Template:
x Address Old
Address
0650 Tonkawa Rd
Document Type
Permits/Inspections
PIN
0511723330005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORONO <br /> 1= ICC-Restoration & Cleaning Services Z&-Z) WA <br /> CLEANi oN 451 Commerce Drive Suite 800 <br /> .• HERVICE9 Woodbury,MN.55125 <br /> •• Phone-651-739-4289 Toll Free 888-739-4289 <br /> Fax-651-702-4292 <br /> MN Lic#20316232 WI Lic#1042030 <br /> Client: Mike Adair Mr.Cell: (952)217-2311 <br /> Property: 650 <br /> Tonkawa,MN 55356 <br /> Operator Info: <br /> Operator: DSMITH <br /> Estimator: Dave Smith Business: (651)739-4289 <br /> Position: Project Manager <br /> Company: ICC-Restoration&Cleaning Services-#41-1734514 <br /> Business: 451 Commerce Drive,Suite 800 <br /> Woodbury,MN 55125 <br /> Type of Estimate: Fire <br /> Date Entered: 11/10/2010 Date Assigned: <br /> Price List: MNMN7X OCT10 <br /> Labor Efficiency: Restoration/Service/Remodel <br /> Estimate: ADAIR-MIKE-RSI <br /> File Number: MN6558487 <br /> TAX ID#41-1734514 <br /> This price will be held for a 30 day period.If an agreement has not been made within that time for ICC Restoration&Cleaning <br /> Services(ICC)to proceed with the repairs,the pricing is subject to change.There may be times when materials take a significant <br /> increase in price do to conditions beyond our control,if this occurs within the 30 day period we reserve the right to make these <br /> material adjustments. <br /> This estimate is written as if all items will be completed by ICC for the total amount of the entire estimate.What this means is <br /> that the services we provide are for the final dollar amount,not the individual line items;although the line items detail the work <br /> to be done they are not equally profitable.If you choose to not have ICC complete all listed repairs as an "all inclusive"project; <br /> ICC reserves the right to revise the estimate with the possibility of increasing individual line items or certain portions of the <br /> project.If changes in the scope of work are requested the estimator will submit a revised bid based on the changes as requested. <br /> Please note that this is only an estimate of the damages,other items may need to be added,replaced,repaired or modified as the <br /> project goes forward.We will notify you and your adjuster of these changes.If there is something you see that we overlooked, <br /> please notify us and we can make the correction in the estimate.We may have areas that we will need your help in as to what <br /> was in these areas before the loss.There may also be some'open items"and when the project is complete,invoices will be <br /> submitted for these open items for reimbursement. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.