My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-06-2014 Council Packet Special Meeting
Orono
>
City Council
>
2014
>
01-06-2014 Council Packet Special Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2019 10:39:15 AM
Creation date
5/30/2019 7:53:41 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item #01- Special Council Meeting - 01106114 <br />File #13-3638 & 13-3639 [Total Pages 99] <br />loadings, including any effects on, or required expansion of, municipal wastewater <br />infrastructure. <br />2) If the wastewater discharge is to a subsurface sewage treatment systems (SSTS), describe the <br />system used, the design flow, and suitability of site conditions for such a system. <br />3) If the wastewater discharge is to surface water, identify the wastewater treatment methods <br />and identify discharge points and proposed effluent limitations to mitigate impacts. Discuss <br />any effects to surface or groundwater from wastewater discharges. <br />The type of wastewater that will be generated will be primarily of domestic uses. No specialized <br />commercial or industrial waste will be generated. An MPCA hazardous waste generator permit <br />will not be required. <br />Based on preliminary analysis from the septic design team, the lots will be served by individual <br />mound -style SSTS systems. The design flow is based on 600 gallons per day per dwelling. The <br />mound systems will not discharge directly to any aquifer or surficial groundwater area. The use <br />of the mound system provides the maximum amount of surficial soil treatment and minimizes risk <br />of contamination by groundwater sources. The sites will be placed at a sufficient uphill distance <br />from any wetland or muck type soil. Figure XXXX shows anticipated drainf eld locations and <br />typical mound system cross section. <br />ii. Stormwater - Describe the quantity and quality of stormwater runoff at the site prior to and post <br />construction, Include the routes and receiving water bodies for runofffrom the site (major <br />downstream water bodies as well as the immediate receiving waters). Discuss any environmental <br />effects from stormwater discharges. Describe stormwater pollution prevention plans including <br />temporary and permanent runoff controls andpotential BMP site locations to manage or treat <br />stormwater runoff. Identify specific erosion control, sedimentation control or stabilization <br />measures to address soil limitations during and after project construction. <br />The proposed stormwater management system will be designed to limit peak runoff to existing <br />flow rates based on the 1, 10, and 100 -year 24-hour events. Approximately 2.0 acres of filtration <br />stormwater management devices will filter or infiltrate the first 1 inch of runoff as to provide <br />acceptable water quality management. The proposed stormwater drainage routes will closely <br />follow existing drainage patterns both in rate and volume on an average annual basis. Figure <br />XXXX displays the current stormwater management plan concept. The filtration devices will be <br />sized to meet required MCWD volume management standards based on infiltration or filtration. it <br />is the goal of the project to work with Minnehaha Creek Watershed staff to restore the onsite <br />wetlands and remaining open areas , through the creation of conservation easement areas <br />throughout the site. <br />A nearby water body, Forest Lake, requires a TMDL based on nutrients. The proposed <br />stormwater management plan will reduce the overall TP to this lake by providing filtration and <br />infiltration BMPs compared to existing conditions of allowing uncontrolled runoff from golf <br />course turf areas, where excess fertilizer and high nutrient -laden runoff is common for runoff <br />leaving the golf course site. <br />All newly constructed impervious surfaces will be treated by stormwater BMPs before routing <br />downstream to existing wetland or water features. At a minimum, there will be a SWPPP that <br />will address both construction BMPs and permanent BMPs that will be in place before, during <br />and after major site grading operations. The SWPPP will contain an Erosion Control Plan, which <br />details specific BMPs and shows the locations, both temporary and permanent, that will address <br />page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.