Laserfiche WebLink
Exhibit D Utility Rates and Fees <br />ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES <br />Connection fees have been determined as a way to provide a fair and equitable recovery of the costs associated <br />with providing water and wastewater utility services to new customers to avoid placing these costs on existing <br />customers. The connection fee includes those portions of existing assets that will benefit new customers together <br />with any anticipated future capital improvements constructed for the purpose of providing utility services to new <br />customers. The connection charge applies to those properties not previously assessed for the associated utility <br />project. <br />MUNICIPAL CONNECTION PERMIT <br />Fee <br />Sewer <br />$50.00 <br />SAC (Sewer Availability Charge) (MCES) <br />$2,485.00 <br />Water <br />$50.00 <br />Horn <br />Quote Basis <br />Mail -in postage and handling surcharge <br />$2.00 <br />Connection inspection (Water or Sewer) <br />$100.00 <br />Disconnection inspection (Water or Sewer) <br />$100.00 <br />SEWER PROJECTS <br />Connection to existing City Sewer System: $5,100.00 <br />Connection to City Sewer in areas still within their assessment window (less than 15 years since project was <br />assessed) shall pay a prorated amount equivalent to the assessment residences were charged at the time <br />of the project: <br />Connection to Sewer System in adjacent city <br />Fee <br />2004 North Long Lake East Extension <br />$14,610.00 <br />2004 West Farm/Homestead <br />$8,765.00 <br />2005-1 Webber Hills/S Brown Rd Ext <br />$13,280.00 <br />2005-1 Dickey Lake Dr N <br />Wayzata Fee Schedule <br />2006-1 Jamestown Road <br />$14,110.00 <br />2007 Farview Lane Sewer <br />$10,650.00 <br />Connection to Sewer System in adjacent city <br />WATER CONNECTIONS <br />Connection to existing City Water Main: $4,240 <br />Connection to Water system in adjacent city <br />Fee <br />$1,900.00 or per current Long <br />Connection to Long Lake Sewer System <br />Lake Fee Schedule <br />$632.00 $1,000 or per current <br />Connection to Wayzata Sewer System <br />Wayzata Fee Schedule <br />WATER CONNECTIONS <br />Connection to existing City Water Main: $4,240 <br />Connection to Water system in adjacent city <br />Fee <br />$1,900.00 or per current Long <br />Connection to Long Lake Water System <br />Lake Fee Schedule <br />$2,115 $2221.00 or per current <br />Connection to Wayzata Water System <br />Wayzata Fee Schedule <br />