My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-11-2017 Council Packet
Orono
>
City Council
>
2017
>
12-11-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:13:20 AM
Creation date
5/29/2019 10:50:36 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Parks <br />Project <br />Detail / Scope <br />Justification <br />Estimated <br />Funding <br />Cost <br />Source <br />Basket Ball Court <br />Proposed improvements include marking <br />This is a Park Commission Priority Park for <br />$ 28,000 <br />Park Fund <br />Surfacing - Navarre <br />trails, removing buckthorn, <br />2018. The project is dependent upon <br />reestablishment of hilltop pasture area <br />receiving a grand from Hennepin County. <br />(tree removal, grass seeding),parking lot <br />improvements. <br />GC Clubhouse <br />Evaluate and seal the south foundation <br />The south foundation wall of the Clubhouse <br />$ 10,000 <br />GC Operating <br />Foundation <br />wall of the Golf course club House. <br />is showing signs of water penetration. The <br />Budget <br />Restoration <br />wall needs to be evaluated and sealed. <br />GC Porch/ Patio <br />Construct a 900 sq ft accessible deck on <br />The Parks commission has identified the <br />$ 47,000 <br />Park Fund <br />the south west side of the clubhouse. <br />need for a deck and a need for the golf <br />course. <br />Golf Course <br />This project would remove approximately <br />Sediment had built up on the bottom of the <br />$ 35,000 <br />Storm Water <br />Irrigation Pond <br />1 ft of sediment from the bottom of the <br />irrigation pond over the past several years <br />Dredging <br />Golf course irrigation pond. <br />reducing the pond capacity and impacting <br />pump operation. <br />GC Cart Parking <br />Construction of a retaining wall, fence and <br />The construction of a deck on the clubhouse <br />$ 28,925 <br />Park Fund <br />dirt work to create a new golf cart parking <br />will eliminate the current golf cart parking <br />area. <br />area. In addition recent increases in course <br />use have resulted in an increased number of <br />carts at the course. <br />GC Fairway <br />Installation of drain tile on Fairways 1, 7 <br />For the past several years the Golf Course <br />$ 13,100 <br />Storm Water <br />Drainage <br />and 8. <br />has been suffering from drainage issues. <br />The system of drain tiles that do exist are <br />very old and no longer serve their purpose. <br />GC Fest Tent Area <br />Preparation of a site for a 40x60 fest tent. <br />The Parks commission has identified the <br />$ 1,800 <br />Park Fund <br />Work will include removal of trees, <br />need for an area to place a fest tent golf <br />grading and seeding. <br />course. Currently the ability to host events <br />at the golf course is limited by the capacity <br />of the clubhouse. <br />Big Island Planning <br />Prepare a conceptual plan with cost <br />In order to inform decision making and <br />$ 12,000 <br />Park Fund <br />estimates including ADA accessible <br />move forward with planning and applying <br />pathways and destinations throughout <br />for grant opportunity and master plan is <br />park, dock area improvements, overlook / <br />required <br />pavilion area, beach improvements, and <br />
The URL can be used to link to this page
Your browser does not support the video tag.