Laserfiche WebLink
Page 1 of 4 MPC Program FY 2017-2022 Date: 04/20/2017 <br />Exhibit A - Table of Tech Sery <br />Used with TA98 Project IDs <br />If a source code is not on this list, a work order is needed. <br />0032 <br />Business Unit Management <br />All expenses of business/office managers for general management and administration of support functions. includes administering <br />central facilities maintenance and facilities capital budgets. <br />0152 <br />Support Services <br />Work that supports general office management, system management such as entering data into SWIFT, PPMS, PUMA and other <br />MnDOT systems, attending staff meetings and other indirect support activities. <br />0400 <br />Equipment Calibration -Mat Insp <br />Use when performing periodic equipment calibration for equipment used in the materials lab or on construction projects. <br />0600 <br />General Training Attended <br />All costs (time, registration, materials, travel expenses, etc.) for attending or participating informal or informal training, including <br />conferences that primarily provide training. _ <br />1182 <br />Soils/Foundation Field/Laboratory Tests <br />All laboratory testing necessary to provide geotechnical information to complete roadway soils recommendations and approvals for <br />use in the development of Final Design Plans and Special Provisions. Lab work includes R -value, resilient modulus, soil <br />classification, gradation, proctor testing, unconfined compression, consolidation, direct simple shear, direct sheer, permeability and <br />triaxial tests. <br />1312 <br />Tech Assist -Outside MnDOT <br />Use when providing technical assistance to an organization external to MnDOT. <br />1421 <br />Bridge Management System <br />Use for tasks related to the Bridge Management System, including operations, administration, or data entry. <br />Operation/Administration/Data <br />1434 <br />Structural Metals Inspection -Non DOT <br />Reviewing shop drawings furnished by suppliers, fabricators, and contractors (working drawing or calculations), and for tasks related <br />1501 Traffic Management System (TMS) <br />1513 Traffic Management System (TMS) <br />Integration <br />to structural metals inspection (materials surveys, physical and chemical laboratory testing, material inspection and engineering, and <br />technical services in the field and offices) for local agency projects. <br />Used by traffic operations staff for all tasks that support the RTMC's operations center (or TOCC) providing traveler information, <br />managing incidents and monitoring the FMS. Includes dynamic message sign maintenance, ramp meter maintenance, camera <br />maintenance, and loop detection activities. Includes maintenance activities related to any ITS or TMS device such as RTMC cables, <br />monitor wall, switchers, routers, or modems. Use to record all costs for maintenance activities related to traffic management fiber <br />optics. Use for tasks related to maintaining traffic operations software including minor software enhancements and fixes. Use when <br />providing traffic operations technical assistance external to MnDOT. <br />For tasks associated with the incorporation of new and existing TMS devices (cameras, loops, DMS, and other ITS devices) into <br />existing infrastructure to ensure proper operation. Use with the Construction/Program Delivery Appropriation. <br />1520 Pavement Management System For tasks related to the operation of the pavement management system, including development and maintenance/technical support. <br />Includes tasks to meet needs external to MnDOT. <br />1716 Record Sampling Used by Materials and Research Section and district materials staff to verify inspector" sampling and testing procedures and <br />checking inspectors' equipment during project construction as required by FHWA. Use when performing field tests on split sample. <br />1721 Traffic Sign Work Orders <br />Use for work involved in preparing work orders for traffic signs. Use only with Maintenance Operations appropriation (T790081). <br />If a source code is not on this list, a work order is needed. <br />