My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-2017 Council Packet
Orono
>
City Council
>
2017
>
08-14-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 8:22:04 AM
Creation date
5/29/2019 8:08:47 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
®PERFORMANCE <br />DRIVEN DESIGN. <br />Total Consultant Cost <br />FEES <br />Average Rate <br />ProjectPrincipal................................................................................................ <br />LHB proposes to perform the work described for the following fees: <br />Project/Discipline Manager............................................................................... <br />$155 <br />Stage One: Convene (24 hours*)............................................................... <br />$ <br />3,000 <br />Stage Two: Imagine (112 hours*)............................................................... <br />$ <br />14,000 <br />Stage Three: Act (64 hours*)..................................................................... <br />$ <br />8,000 <br />Total...............................................................................................$ <br />SeniorTechnician................................................................................................ <br />25.000 <br />Reimbursable expenses (not to exceed)........................................................... <br />$ <br />1,000 <br />We will work with the city to establish a project schedule and critical dates (particularly <br />the dates of the design workshop), but we can begin work immediately. Additional <br />information about our fee follows. <br />*Hours Based on Average Rates <br />STANDARD HOURLY RATE SCHEDULE <br />Position Description <br />Average Rate <br />ProjectPrincipal................................................................................................ <br />$215 <br />Project/Discipline Manager............................................................................... <br />$155 <br />Senior Architect/Landscape Architect/Engineer/Land Surveyor ......................... <br />$130 <br />Architect/Landscape Architect/Engineer/Land Surveyor .................................... <br />$113 <br />Certified Interior Designer.................................................................................. <br />$96 <br />SeniorDesigner................................................................................................. <br />$100 <br />Designer.............................................................................................................. <br />$82 <br />SeniorTechnician................................................................................................ <br />$96 <br />Technician........................................................................................................... <br />$63 <br />Administrative.................................................................................................... <br />$74 <br />Actual rates will be based upon the individual assigned. <br />City of Orono - Land Use Planning Services for the Navarre Area Plan 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.